The project consists of stabilization of an existing deteriorated culvert beneath Berlin Road. The stabilization method shall consist of installation of a structural pipe arch liner within the existing culvert followed by annular space grouting and construction of end bulkheads. The intent is to provide structural stabilization. Bid documents can be obtained by emailing Barbara Columbus at bcolumbus@williamstownma.gov
Pre-Bid Conference: A pre-bid meeting is scheduled for October 7, 2026, at 10am and will promptly end at 11:30am.
The work consists of stabilization of an existing deteriorated culvert beneath Berlin Road by installation of a structural pipe arch liner within the existing culvert followed by annular space grouting and construction of end bulkheads to provide structural stabilization.
We post new plumbing opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1734-DPW10-DPW00-133887), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.