WWTP Yard Piping Phase 1D
The contractor will dig and install approximately 1200 linear feet of PVC piping to connect three wastewater effluent tanks and treatment units at the existing WWTP at 100 Linden Street. The work includes gravity piping that must be low air pressure tested per specifications, and site restoration with loam and seed. The area has been cleared and grubbed, and erosion control and temporary fencing are required outside the contractor's operating and storage areas.
We post new plumbing opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1627-BOS17-BOS17-134664), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.