Scope of Work includes: installation of erosion controls, pond dewatering, fountain removal, restoration, and re-installation, installation of water quality pipes and methane venting system, installation of liner system consisting of geogrid, HDPE/LDPE liner, Armor Stone, and Benthic Sediment, installation of wet well, pump, drywells, bedrock well system, and pumphouse, grading and installation of walkway materials as noted, installation of dock, installation of plantin
Pre-Bid Conference: A pre-bid meeting/site visit will take place on Tuesday, November 10 at 1:00 PM. Interested bidders shall meet at the Bartlet Mall located at 153 Auburn Street, Newburyport, MA 01950.
Scope of Work includes: installation of erosion controls, pond dewatering, fountain removal, restoration, and re-installation, installation of water quality pipes and methane venting system, installation of liner system consisting of geogrid, HDPE/LDPE liner, Armor Stone, and Benthic Sediment, installation of wet well, pump, drywells, bedrock well system, and pumphouse, grading and installation of walkway materials as noted, installation of dock, installation of plantin
We post new concrete opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1158-NBPT3-NBPT3-134877), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.