Sinkhole Repair Devens CSMS (MA National Guard)
Pre-Bid Conference: Mandatory site visit will be held on Wednesday November 25 at 11:00 AM. Please contact the PM Jimmy Pereira (jimmy.pereira.nfg@army.mil)
The contractor shall furnish all material, labor, and equipment needed to repair the designated sinkhole. Work may include, but is not limited to, repairing the existing 15" CPE roof drain, repairing the existing 6" perforated CPE piping between the drywell manholes, cleaning all drywell manholes of accumulated aggregate, sediment, and debris, and any other corrective work necessary to restore the system to proper operating condition. The contractor shall call and maintain a CBYD/811 utility notification, mobilize personnel and equipment, perform machine and hydro excavation to safely expose utilities, perform confined space entry into manholes as required, and provide suitable bedding and backfill materials compacted in lifts. The contractor shall demobilize all personnel, equipment, and materials upon completion of the work.
We post new facilities & janitorial services opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1069-MILDV-10000-135519), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.