Bid closing date = Bid opening date
The contractor shall furnish and install one ductless HVAC split system to address cooling and heating needs in a server room on the third floor, including an indoor air handler, outdoor condensing unit, insulated refrigerant line set, condensate drain piping, electrical disconnect, control wiring, and thermostat. The contractor shall also furnish and install one dedicated 20-amp, 120-volt branch circuit from the existing electrical panel to the attic space, one dedicated circuit to the split system unit, and one 20-amp quad receptacle. All lines and piping shall be surface mounted, with a single point of penetration below the roof soffit. The contractor is responsible for all required permits and inspections.
We post new electrical opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1042-ENVOP-FAC01-134547), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.