Bid closing date = Bid opening date
Furnish and install one ductless HVAC split system for a third-floor server room including indoor air handler, outdoor condensing unit, insulated refrigerant line set, condensate drain with secondary drain and overflow protection, electrical disconnect, control wiring and thermostat, pressure test, evacuation, charge, startup and functional testing, plus electrical installation of a dedicated 20-amp 120-volt circuit to the attic, dedicated circuit to the split unit, 20-amp quad receptacle, conduit, cable, boxes, breaker, labeling and testing, with surface-mounted routing sharing a single sealed penetration below the roof soffit, including permits, inspections, coordination and cleanup.
We post new hvac opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1042-ENVOP-FAC01-134545), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.