Do Not Use COMMBUYS to Bid on this Project
Pre-Bid Conference: Notice to Contractors
The work consists of replacing the existing bridge superstructure O-06-030 carrying Route 56 over the French River in Oxford, MA with a new single-span bridge superstructure consisting of Prefabricated Bridge Units (PBUs) and modifications of the abutments and wingwalls to accommodate the new superstructure. Abutment and wingwall modifications include removal of the bridge seats, backwalls, approach slabs, and upper portions of the wingwalls and parapets and installation of new precast concrete abutment bridge seats, backwalls, moment slabs, and approach slabs. Also included is the reconstruction of approximately 505 feet of Leicester Street including full depth roadway construction, pavement fine milling, hot mix asphalt paving, guardrail, pavement markings, the installation of temporary utility bridge support, relocation of overhead wires, traffic signal timing, and other incidental items.
We post new uncategorized opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1030-0H100-0H002-133656), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.