Contractor is responsible for removing the existing roof in its entirety and replacing it with a new roof assembly.
All work is to be performed in accordance with the project specifications and drawings located in Part IV of the
Bid Documents.
Pre-Bid Conference: A MANDATORY Pre-Bid Conference will be held at 10:00AM on Wednesday 12/09/2026.
Contractors should meet the Project Engineer at the Main Lobby of One Prince Street Northampton, MA 01060-3600 to
review and discuss project details.
The contractor is responsible for the removal and disposal of the existing EPDM roof in its entirety and replacing it with an entirely new system with a thermoplastic membrane. All work is to be performed in accordance with the project specifications and drawings located in Part IV of the Bid Documents.
We post new roofing opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-27-1022-DMH08-8210C-135631), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.