PVTA seeks quotes from licensed Massachusetts electrical contractors for electrical modifications at 17 bus berth stops at Springfield Union Station. FTA funded. Massachusetts prevailing wage and Davis-Bacon apply. Questions due December 3, 2026 at 2:00 PM to wbrown@pvta.com. Quotes due December 11, 2026 at 2:00 PM by email as one PDF. See the RFQ and Attachment 1 under Attachments.
Pre-Bid Conference: Site walkthrough (not mandatory): Tuesday, December 1, 2026 at 1:00 PM EST, Springfield Union Station, 55 Frank B. Murray Street, Springfield, MA. Email wbrown@pvta.com by 2:00 PM on November 30 to attend.
The contractor upgrades shelter and canopy bus stop electrical wiring per Attachment 1, including rewiring 10 shelters and 7 canopy stops to connect new displays via supplied power cords and replacing berth number sign cable, replacing canopy junction boxes where needed, obtaining the City electrical permit and testing and energizing stops after PVTA installs displays, separating Canopy Panel Breaker 5 with a new 20-amp breaker, diagnosing Shelter Panel 1 Breaker 7, complying with Massachusetts Electrical Code using new outdoor-rated materials, coordinating work in the operating terminal, and warranting work for one year after final acceptance.
We post new electrical opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-26-2263-PTA01-PTVA1-135613), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.