Bridgewater Public Library Window Replacement
The Contractor shall furnish all labor, materials, equipment, supervision, permits, tools, transportation, and incidentals necessary to complete the work, including removal and legal disposal of 26 existing double-hung windows, 3 extended half-round picture windows, and 1 mulled picture window assembly; installation of 26 new double-hung windows (Energy Star certified, Low-E insulated glazing), 3 extended half-round picture windows, and 1 mulled picture window assembly with half-round transom; new interior primed pine extension jambs and casing, exterior PVC trim, flashing systems, and weatherproof sealants; and all work incidental thereto in accordance with the Specifications.
We post new windows opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-26-1249-B610-B610-135540), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.