The Massachusetts Department of Transportation (MassDOT) is soliciting Letters of Interest from parties interested in the Request for Qualifications (RFQ) package for this Design-Build Project
Pre-Bid Conference: The deadline for receipt of Letters of Interest is March 10, 2026 at 12:00 PM (noon). All parties must send a Letter of Interest to MassDOTBIDDocuments@dot.state.ma.us.
The scope of work includes, but is not limited to, the design and construction of two new bridges carrying Route 3 Northbound and Southbound over the North River between Norwell and Pembroke. The project also includes removal of the existing bridge structures, roadway reconstruction, highway drainage/stormwater improvements, traffic management, wetland restoration, landscaping, pavement markings and signage, Hazardous Materials Assessment and Remediation and all other related bridge and highway work.
We post new structural work opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Massachusetts work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: COMMBUYS (Massachusetts) (bid BD-26-1030-0H100-0H002-124895), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.