.a MINIMUM 400KW Load Bank Unit. The Unit can exceed this rating. For comparison, a Mosebach XL 400 Trailer Load Bank (400KW) or equal is the basis of the design. The trailer is an optional quote and may be purchased at the time of the generator, however it is not to be included as part of the cost of the LOAD BANK UNIT
Pre-Bid Conference: NONE
Supply and deliver a 400 kW or greater Load Bank Unit including 8 fifty-foot color-coded cables with bus bar connections, a starter spare parts kit, single voltage options, NRTL certification, and a 5-year warranty. Unit must be shipped to 5 West Street, Auburn, MA 01501 and be deliverable within 45 days of receipt of purchase order. Bidders may optionally quote a dual-wheel enclosed trailer for separate purchase at time of delivery, which shall not be included in the load bank unit cost.
We post new generators opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-25-1242-ARN22-ARN22-133646), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.