Request for Qualifications for construction of new water treatment facility. The Work consists of construction of a 1.3 MGD PFAS removal facility located at 76 Church St, Auburn, MA. The primary treatment utilizes pressure filtration units with Granular Activated Carbon media.
Work includes chemical feed systems, backwash residuals holding tank below the first floor within the building footprint, restroom, HVAC, plumbing, fire protection system, electrical systems and associated site work.
The Work consists of construction of a 1.3 MGD PFAS removal facility located at 76 Church St, Auburn, MA. The primary treatment utilizes pressure filtration units with Granular Activated Carbon media. Work includes chemical feed systems, backwash residuals holding tank below the first floor within the building footprint, restroom, HVAC, plumbing, fire protection system, electrical systems and associated site work. Exterior components include a masonry CMU building, new paved driveway and gravel driveway area, below grade utilities including water, stormwater collection and treatment, and a sewer connection. Other work includes selective demolition of existing chemical feed equipment and replacement of well pumps and motors within the well pump buildings.
We post new general contractors opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-23-2126-AWD00-CHUR-134709), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.