THIS SCOPE COVERS THE FULL REMOVAL OF THE SKIRT SIDING ALT ALL EXTERIOR WALLS, AND REPLACEMENT WITH NEW 8" PVC SKIRT, WITH ALL ASSOCIATED METAL DRIP EDGE AND FLASHING, AND SELF ADHERED MEMBRANE FLASHING. GC TO ACCOUNT FOR ANY RIPPING AND ADJUSTING OF 8" PVC STOCK AS REQUIRED TO ACCOMMODATE NEW SKIRT BOARD WITH EXISTING SIDING. THE BUILDINGS ARE DIVIDED INTO 5 BUILDING
TYPES, with 53 buildings expected to be developed in this scope
Pre-Bid Conference: PRE-BID CONFERENCE / SITE VISIT: Scheduled
Date and Time: 12/02/2026 at 10:00AM EST Address: 37 Apollo Drive, New Bedford, MA 02745
The project covers the full removal of the skirt siding at all exterior walls and replacement with new 8" PVC skirt, including all associated metal drip edge and flashing, and self-adhered membrane flashing. The general contractor must account for any ripping and adjusting of 8" PVC stock as required to accommodate new skirt board with existing siding. The buildings are divided into 5 building types, with 53 buildings expected to be developed in this scope. The development will remain operational during the work, and all work needs to be coordinated with the New Bedford Housing Authority and the City of New Bedford Inspectional Services Department.
We post new goods & materials opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: COMMBUYS (Massachusetts) (bid BD-22-1221-MOD00-MOD-135663), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.