Addendum Date/Time: 10/27/2026 Addendum 01
Pre-bid Meeting: Mandatory: 11/05/2026 2:00 pm
The project consists of replacing and improving a section of the existing sewer crossing within the creek at Lakes at Saddle Creek. Work includes furnishing and installing a 24-inch carbon steel casing (or stainless steel as an additive alternate), 18-inch SDR-35 PVC sewer line, 48-inch fiberglass closed bottom manholes, concrete supports, riprap, bypass pumping system, storm water pollution prevention plan, demolition, disposal, surface and site restoration, and all associated appurtenances. The contractor must maintain sewer service via temporary bypass pumping throughout construction. Work within and adjacent to the creek must comply with USACE and other environmental requirements. The contractor is responsible for construction methods, temporary controls, protection of the creek, and restoration of disturbed areas. Access is through existing City easements; the contractor must coordinate access and minimize disturbance. The project includes erosion protection, site restoration, and incidental work for a complete and operational sanitary sewer system.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Town or county website (bid abilenetx.gov-499), retrieved via the Bid Postings page on the town or county's own website. View the official posting, and always confirm requirements and deadlines with the issuing agency.