Scope of Work for this Contract includes the clearing, grading, and construction of a detention pond approximately 21 acres (surface area) with associated backslope interceptor and outfall structures. An underground storm sewer system approximately 6,620 linear feet of storm sewer of various sizes (24–60-inch pipes) including inlets, junction boxes, and Headwalls. And a landscape berm (1,200 linear feet, 20 ft. top width, 80 ft. Bottom width, and approximately 8 ft in height) within Cedar Port Navigation and Improvement District.
Pre-bid meeting: November 23, 2026 at 2:30 PM (Chicago) — This will be a Teams Meeting online. Meeting link will be sent out by request. Please contact yan@aquaterra-engineering.com or ani@aquaterra-engineering.com. — This will be a Teams Meeting online. Meeting link will be sent out by request. Please contact yan@aquaterra-engineering.com or ani@aquaterra-engineering.com.
Bid opening: December 3, 2026 at 2:00 PM (Chicago) — This will be a Teams Meeting online. Meeting link will be sent out only to the bidders who submit their bids after 2PM CST on 12/03/2026. — This will be a Teams Meeting online. Meeting link will be sent out only to the bidders who submit their bids after 2PM CST on 12/03/2026.
Questions due: November 30, 2026 at 5:00 PM (Chicago)
Scope of Work for this Contract includes the clearing, grading, and construction of a detention pond approximately 21 acres (surface area) with associated backslope interceptor and outfall structures. An underground storm sewer system approximately 6,620 linear feet of storm sewer of various sizes (24–60-inch pipes) including inlets, junction boxes, and Headwalls. And a landscape berm (1,200 linear feet, 20 ft. top width, 80 ft. Bottom width, and approximately 8 ft in height) within Cedar Port Navigation and Improvement District.
We post new excavating opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ae8b829a2407d699e6dc811), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.