The objective of this Early Works package is to procure, inspect, and deliver long-lead or critical-path Process Pipes, Valves, Instruments, and Accessories required for the initial construction, tie-ins, and mechanical completion of designated water and chemical processing facilities. This scope ensures that all requisite materials comply with specified engineering standards, pressure ratings, material compatibility (corrosion resistance for chemical/brine services), and quality assurance requirements prior to site installation. The structures involved are: Raw Water Tanks
Type of work: Pipe/Valve/Instrument Supply
Bid opening: November 5, 2026 at 2:00 PM (Chicago) — via Civcast
The scope ensures that all requisite materials comply with specified engineering standards, pressure ratings, material compatibility (corrosion resistance for chemical/brine services), and quality assurance requirements prior to site installation. The structures involved are: Raw Water Tanks, Provisional Plant, Treatment Structural, Pressure Control Structure, Chemical Facility, Analyzer Facility, Chemical Injection Facility, Brine Storage Tank, Surface Discharge Pig Receiver Station, and Western Well Field Pump Station.
We post new materials & suppliers opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ae0b998f03e002820697cb8), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.