The project includes construction of approximately two-thousand one hundred (2,100) linear feet of 12-inch water line and six hundred (600) linear feet of 10-inch water line as detailed in the Construction Plans and Specifications. The water lines begin on the southwest corner of the intersection of FM664/Ovilla Rd and S Overlook Drive, continuing south along S Overlook Drive before turning east along Dana St, then turning south along Carson St, before terminating in front of the elevated storage tank on the south end of Carson St. A second line runs parallel to Dana St from the intersection with Carson St to the intersection with IH-35E Southbound Service Road.
Bid opening: November 17, 2026 at 2:00 PM (Chicago) — 101 Live Oak Street, Red Oak, Texas 75154
Questions due: November 12, 2026 at 2:00 PM (Chicago)
Questions asked: 1
Bid documents (download requires a free CivCast account):
The project includes construction of approximately two-thousand one hundred (2,100) linear feet of 12-inch water line and six hundred (600) linear feet of 10-inch water line as detailed in the Construction Plans and Specifications. The water lines begin on the southwest corner of the intersection of FM664/Ovilla Rd and S Overlook Drive, continuing south along S Overlook Drive before turning east along Dana St, then turning south along Carson St, before terminating in front of the elevated storage tank on the south end of Carson St. A second line runs parallel to Dana St from the intersection with Carson St to the intersection with IH-35E Southbound Service Road.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>No estimated cost is available for this project.</p>""4a3094ff-5d5f-48d9-a0cd-07b75eb825da""2026-10-29T13:06:46.662Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.