This is a private runway approximately 3700 ft by 50 ft wide with hanger space. The scope of the project is a base bid of adding 5 ft HMA to the turnarounds and rehabilitate the existing pavement with crack sealing and either slurry seal or micro-surfacing, or performing a 3-inch HMA mill and overlay or crack sealing with 3-inch HMA overlay.
Type of work: Private runway paving rehabilitation
Bid opening: November 20, 2026 at 2:00 PM (Chicago)
Questions asked: 5
Bid documents (download requires a free CivCast account):
The scope of the project is a base bid of adding 5 ft HMA to the turnarounds and rehabilitate the existing pavement with crack sealing and either slurry seal or micro-surfacing, or performing a 3-inch HMA mill and overlay or crack sealing with 3-inch HMA overlay.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ada8e2e1c7615dd143b4a30), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.