Work under this Contract includes, but is not limited to, the following:
Construction of a permanent storage building at the District’s Wastewater Treatment Plant, including foundation, structural, electrical, and plumbing improvements.
Restroom facilities and associated utility connections.
Site work and clean up.
Engineer's estimate: $250,000
Pre-bid meeting: October 29, 2026 at 10:00 AM (Chicago) — Teams Meeting, Non-mandatory — Microsoft Teams Meeting ID: 224 096 164 702 803; Passcode: qg6JC7CB
Bid opening: November 5, 2026 at 10:00 AM (Chicago) — 1080 W. Sam Houston Pkwy N., Suite 200, Houston TX 77043 — https://teams.microsoft.com/meet/224096164702803?p=6gApPmkpCYBI4sNJtm Include on your Bid the Project Number and "Bid Enclosed
Questions due: November 2, 2026 at 5:30 PM (Chicago)
Questions asked: 20
Please note that the Pre-Bid Meeting is Virtual.
Uploaded
Bid documents (download requires a free CivCast account):
Work under this Contract includes, but is not limited to, the following: Construction of a permanent storage building at the District’s Wastewater Treatment Plant, including foundation, structural, electrical, and plumbing improvements. Restroom facilities and associated utility connections. Site work and clean up.
We post new general contractors opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>An addendum will be issued with the signed and sealed Structural Drawings and specifying the roof decking. </p>""dc39f48c-e544-417f-9da6-0e521a642977""2026-10-28T22:09:21.189Z"false"<p>This will addressed in addendum regarding the finished floor grade. The geotech report has been uploaded. </p>""171ce804-5d7e-4e8e-8f88-ed1f6fb0ef12""2026-10-28T22:17:15.225Z"false"<p>Conditioning is not required. </p>""7bfee414-acda-4650-9624-48e482e951a6""2026-10-29T14:13:10.902Z"false"<p><span style=\"color: rgb(8, 79, 106);\">A discrepancy exists between Structural Sheet S1 and the Architectural Drawings/Specifications. The architectural roofing documents govern for roofing scope.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">Provide a modified bituminous roofing system in accordance with Specification Section 07 55 00, including roof board insulation as specified in Section 07 22 00. The requirement for a 4-ply built-up roof shown on Sheet S1 is not applicable to this project.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">Provide pre-finished aluminum fascia and aluminum gravel stop/edge metal in accordance with the architectural details and Specification Section 07 62 00. The 24-gauge galvanized gravel guard indicated on Sheet S1 is not applicable.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">The wood nailer height shall be coordinated with the selected roofing manufacturer's approved assembly and edge metal requirements to provide proper alignment with the adjacent fascia system.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">If required, provide roof vents only where indicated on the architectural and/or mechanical drawings. Contractor shall coordinate vent quantity and locations with the approved roofing, mechanical, and plumbing drawings prior to installation.</span></p>""e12e2940-635a-492c-9159-c0dfe236b843""2026-10-27T22:31:23.95Z"true"<p><span style=\"color: rgb(8, 79, 106);\">A discrepancy exists between Structural Sheet S1 and the Architectural Drawings/Specifications. The architectural roofing documents govern for roofing scope.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">Provide a modified bituminous roofing system in accordance with Specification Section 07 55 00, including roof board insulation as specified in Section 07 22 00. The requirement for a 4-ply built-up roof shown on Sheet S1 is not applicable to this project.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">Provide pre-finished aluminum fascia and aluminum gravel stop/edge metal in accordance with the architectural details and Specification Section 07 62 00. The 24-gauge galvanized gravel guard indicated on Sheet S1 is not applicable.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">The wood nailer height shall be coordinated with the selected roofing manufacturer's approved assembly and edge metal requirements to provide proper alignment with the adjacent fascia system.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">If required, provide roof vents only where indicated on the architectural and/or mechanical drawings. Contractor shall coordinate vent quantity and locations with the approved roofing, mechanical, and plumbing drawings prior to installation.</span></p>""cc836d21-9647-4983-8a97-3e382a8b6ff8""2026-10-27T22:31:34.504Z"false"<p><span style=\"color: rgb(8, 79, 106);\">Door 100-B shall be a non-insulated steel overhead coiling door. The insulated curtain requirement identified in Specification Section 08 33 20 does not apply to this opening. Provide manufacturer's standard galvanized steel curtain slats in accordance with the door schedule and project requirements.</span></p><p></p><p><span style=\"color: rgb(8, 79, 106);\">Door operation shall be manual (non-motorized). No electrical power or fire alarm interface is required for this door. The absence of a power circuit on the electrical drawings is intentional and consistent with the door design.</span></p>""31d2358d-2138-42ca-9d16-8d1f43ff71a4""2026-10-27T22:30:46.888Z"false"<p><img src=\"https://images-app.civcast.com/public/project/6ada8e001c7615dd143b4a2e/qa/6adf64b1990bcb9850b348f2/539701da-2ec1-4b7c-afe9-0f6e713d3988.png\" width=\"300\"></p><p></p>""36b3773d-74be-43cb-a315-99ff1b355504""2026-10-29T14:25:47.585Z"false"<ol><li><ol><li>There is currently 12" of space above the existing Clarifier No. 2 starter bucket in section 3 of 3 in the MCC. This is sufficient space to install (1) 100AF/2P/30AT breaker.</li><li>The exist 1" empty conduit from the MCC room to the existing stub-up was installed in the Spring/Summer of 2026 as part of a separate project. </li><li>Branch conduit installed inside the plant shall be rigid galvanized steel or rigid aluminum conduit with galvanized mounting hardware.</li><li>Install one (1) grounding electrode conductor from the new mini-power zone to one (1) 20-ft long, 3/4" diameter, copper-clad steel ground rod outside of the building. The new building does not require additional grounding. </li></ol></li></ol><p></p>""e0c950a8-a551-4822-8b8e-0a6dc56d5726""2026-10-29T16:23:56.55Z"false"<p><span style=\"color: rgb(8, 79, 106);\">For the overall edge of wall to edge of wall distance of 21-feet, a 5-1/4” total vertical slope is required to comply with a minimum ¼” per foot slope. Therefore, provide wall heights as shown on the architectural Sheet A3.</span></p>""e8cb714d-99e8-41f7-8519-307bde545fa4""2026-10-27T22:38:08.877Z"false"<p>The structural plan governs. </p>""4ee35e43-b0f2-46fe-8ec2-92ac559813c1""2026-10-29T14:13:47.933Z"false"<p>4000 psi. </p>""37548b10-85ac-4dbc-a345-e9702a50f17e""2026-10-28T22:31:09.92Z"false"<p>#4 at 24 OCEW on a 6-inch treated subgrade. </p>""806f4908-c15b-413f-a43e-f0621d8f809d""2026-10-28T22:33:07.376Z"false"<p>tap, meter and backflow preventer to be provided by the District Operator. </p>""d3b6e4be-2fd8-4105-af14-df39cf6b435f""2026-10-28T22:34:25.688Z"false"<p>invert depth is unknown and will be fit in field. The actual connection to the existing sanitary sewer will be completed by District Operator. </p>""30c57b16-9bb9-4496-844e-011db8964c7c""2026-10-28T22:35:42.196Z"false"<p><span style=\"color: rgb(8, 79, 106);\">Exterior CMU walls shall receive a painted finish. The color shall be selected by the Owner in accordance with Architectural Sheet A3. The requirement for integral color CMU is not applicable to this project. Provide an integral waterproofing admixture in exterior CMU masonry units and mortar as specified. Because the building is non-conditioned, perlite-filled cores are not required unless specifically indicated otherwise on the structural drawings for reinforced cells or special conditions. Specification Section 09 90 00 shall be interpreted to include painting of the exterior CMU surfaces identified on the architectural drawings. The Contractor shall provide exterior CMU painting in accordance with the project finish requirements.</span></p>""676ff3cd-bbf0-4914-9176-4463ec0264ed""2026-10-27T22:38:43.663Z"false"<p>located by contractor and submitted for approval. </p>""b8e185c0-ca06-41aa-bc65-d5f8b0a22dac""2026-10-28T22:36:25.634Z"false"<p><span style=\"color: rgb(8, 79, 106);\">Provide FRP doors with FRP frames as indicated on Sheet A1. Aluminum frames referenced in Specification Section 08 25 50 are not applicable to this project. Contractor shall furnish a complete FRP door and FRP frame assembly.</span></p>""645cd9e8-9896-48f3-a793-210dcb599f24""2026-10-27T22:39:04.433Z"false"<p>Yes, an addendum will be issued. </p>""d6a9255a-a0d4-4ec8-9c23-ccd025f62164""2026-10-28T12:55:34.439Z"false"<p>Construct as shown on the sealed plans</p>""74ca786c-561e-4f1d-8774-8da4ac94a2e3""2026-11-02T22:33:19.727Z"false"<p>Please follow the geotechnical report. </p>""e015b2a1-bdd6-4a76-9f02-6ad13c86ed64""2026-11-02T22:34:42.969Z"false"<p><span style=\"color: black;\">The 2" sand is a Maximum. It is not required.</span></p>""ee8cce47-8ba9-4b34-9f7a-200d4237dcad""2026-11-02T22:35:29.983Z"false"<p>Uploaded</p>""9bcdfcb6-ad73-4569-833c-936bca20c500""2026-11-02T22:42:22.032Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.