Request for Qualifications (RFQ)
**Trinity River Distribution System – B-2 Pipeline Project **
Construction Management & Inspection (CM&I) Services
Statements of Qualifications (SOQ) will be received until **2:00 p.m., Central Local Time (CLT), on Wednesday, December 16, 2026, **by the Coastal Water Authority (CWA), located at 1801 Main Street, Suite 800, Houston, Texas 77002. SOQ’S received after this time will be returned unopened.
Items or services: The Coastal Water Authority (“CWA”) is requesting Statements of Qualifications (“SOQ”) from firms that can demonstrate the resources, experience and qualifications necessary to provide Construction Management and Inspection (CM&I) Services for the Trinity River Distribution System B-2 Pipeline Project.
**A mandatory pre-submittal briefing will be conducted on October 28, 2026, at 2:00 p.m. local time, at CWA’s Downtown Office – 1801 Main St, Suite, 800, Houston, Texas 77002. A Maximum of two (2) individuals per team/firm will be allowed to attend the pre-submittal conference. **
The Request for Qualifications (RFQ) may be obtained electronically from CIVCAST (www.civcastusa.com) on Friday October 16, 2026. Any questions must be submitted in accordance with the RFQ.
Type of work: Construction Management & Inspection Services (CM&I)
Pre-bid meeting: October 28, 2026 at 2:00 PM (Chicago) — 1801 Main St, Suite 800 Houston, Texas 77002 — A maximum of two individuals per team/firm will be allowed to attend the pre-submittal conference
Bid opening: December 16, 2026 at 2:00 PM (Chicago) — 1801 Main St, Suite 800 Houston, Texas 77002
Questions due: November 6, 2026 at 5:00 PM (Chicago)
Questions asked: 2
Bid documents (download requires a free CivCast account):
We post new uncategorized opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ad0d6f8ff056f9bdc43faf2), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.