Rehabilitation of the wastewater treatment plant lift station, including recoating of the wet well walls and the recoating of the upstream collector box. Also, includes replacement of the riser pipes.
Engineer's estimate: $1.2M
Pre-bid meeting: October 22, 2026 at 11:00 AM (Chicago) — Jackrabbit Road Wastewater Treatment Plant, 16720 Pine Forest Drive, Houston, TX — THE PRE-BID MEETING IS MANDATORY
Bid opening: November 5, 2026 at 2:00 PM (Chicago) — Sander Engineering Corporation, 2901 Wilcrest Drive, Suite 550, Houston, TX 77042
Questions asked: 9
Bid documents (download requires a free CivCast account):
Rehabilitation of the wastewater treatment plant lift station, including recoating of the wet well walls and recoating of the upstream collector box, plus replacement of the riser pipes.
We post new concrete opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>For this project, we prefer to stay with a calcium aluminate product. Quadex is not approved for this project.</p>""907f0804-b7eb-462d-967c-842694785172""2026-10-26T15:05:17.082Z"false"<p>1 original and 1 copy is acceptable.</p>""523f0f6a-ddb8-4995-9893-6721b2b747dd""2026-10-26T15:05:22.796Z"false"<p>There is no electrical work on this project, disregard Note 7 on Sheet 6</p><p></p><p>Also disregard Note 2 under Scope of Work on Sheet 3 regarding pump replacement. The pumps will not be replaced in this project.</p>""39e87de4-e7ae-41df-bedc-775802212bae""2026-10-26T15:11:09.465Z"false"<p>The flows shown are the peak flows</p>""3d5ad9b4-ecf7-48bb-ba27-c45be71e7e4e""2026-10-29T15:38:28.023Z"false"<p>A 1295 form is not required with the bid. The 1295 form will be required of the selected contractor prior to award.</p>""f7e32666-2b1c-4700-92d1-b7e1973dbf30""2026-10-28T20:32:04.645Z"false"<p>Existing pumps are all 57 HP ABS pumps.</p>""b7190a4c-29f1-4fc7-aba8-63dc73395105""2026-11-02T15:17:47.035Z"false"<p>See specification 09901 in the manual</p>""6a899a6d-266d-4f81-b556-7e850411d254""2026-10-29T15:39:22.4Z"false"<p>32-1/2" is acceptable</p>""9e88c83a-0062-41fb-b3de-1c78a4c761c9""2026-11-03T15:04:13.049Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.