All items necessary for the construction of Phase 1 including all utility work for installing storm, water, and wastewater pipe and appurtenances; manholes, inlets, headwalls and other various required structures; excavation and embankment; street improvements; pond improvements; erosion & sedimentation controls; revegetation; and various other improvements.
Type of work: Streets, Drainage, Wastewater, & Water Improvements
Pre-bid meeting: October 13, 2026 at 3:30 PM (Chicago) — Gray Civil, Inc. - 8834 N. Capital of TX Hwy, Ste. 140, Austin, TX 78759 — Attendance at Pre-Bid Meeting is Non-Mandatory
Bid opening: October 27, 2026 at 11:00 AM (Chicago) — Gray Civil, Inc. - 8834 N. Capital of TX Hwy, Ste. 140, Austin, TX 78759
Questions due: October 20, 2026 at 5:00 PM (Chicago)
Questions asked: 3
Bid documents (download requires a free CivCast account):
All items necessary for the construction of Phase 1 including utility work for installing storm, water and wastewater pipe and appurtenances, manholes, inlets, headwalls and other required structures, excavation and embankment, street improvements, pond improvements, erosion and sedimentation controls, revegetation and various other improvements.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p><span style=\"background-color: white;\">Yes, Bidders are permitted to access the site to dig test holes provided each of the following conditions are met:</span></p><p>\t<span style=\"background-color: white;\">1. Provide 24 hours notice to being on site to </span><a href=\"mailto:sswiderski@gray-civil.com\" rel=\"noopener noreferrer\" target=\"_blank\" style=\"background-color: white;\">sswiderski@gray-civil.com</a></p><p>\t<span style=\"background-color: white;\">2. Provide proof of insurance to the Engineer.</span></p><p>\t<span style=\"background-color: white;\">3. Limit disturbance within the limits of the subdivision project.</span></p><p>\t<span style=\"background-color: white;\">4. Refill any holes.</span></p><p>\t<span style=\"background-color: white;\">5. Remove any dirt/mud tracked onto existing streets.</span></p><p><span style=\"background-color: white;\">There is a gate along RM Rd 1869, the combination is 2020.</span></p><p></p>""a2479a02-d572-4500-a2d5-df3c60c8179e""2026-10-08T16:39:06.419Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6abff6f8f1055a862585cb30), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.