Project scope shall include the rehabilitation of Lift Stations No. 1 and No. 2, including recoating of the wet well interiors and wet well/dry vault piping, removal and replacement of perimeter fencing and gates, and installation of a new generator and generator pad at Lift Station No. 1.
Type of work: Lift Station Rehabilitation
Pre-bid meeting: October 13, 2026 at 3:00 PM (Chicago) — EHRA via Zoom — Non Mandatory Pre Bid
Bid opening: October 20, 2026 at 3:00 PM (Chicago) — EHRA and Zoom — Sealed bid or electronic bids
Questions asked: 1
It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and/or Bid Amounts.
Bid documents (download requires a free CivCast account):
Project scope shall include the rehabilitation of Lift Stations No. 1 and No. 2, including recoating of the wet well interiors and wet well/dry vault piping, removal and replacement of perimeter fencing and gates, and installation of a new generator and generator pad at Lift Station No. 1.
We post new fencing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>No.</p>""870b67ed-076d-4a1c-8797-f345ddd897ca""2026-10-05T20:55:20.879Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6abfd8935c03ac6057a8edb8), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.