Construction of 15,044 LF of 16" DIP that consists of 11,886 LF of non-restrained joint pipe, 3,158 LF of restrained joint pipe and 190 LF of 36" encasement pipe.
Pre-bid meeting: October 5, 2026 at 2:00 PM (Chicago) — 2600 Via Fortuna, Building 1, Suite 100, Austin, Texas, 78746 — Consor North America, Inc Office
Bid opening: October 12, 2026 at 2:00 PM (Chicago) — 2600 Via Fortuna, Building 1, Suite 100, Austin, Texas, 78746 — Consor North America, Inc Office
Questions asked: 35
Bid documents (download requires a free CivCast account):
Construction of 15,044 LF of 16" DIP that consists of 11,886 LF of non-restrained joint pipe, 3,158 LF of restrained joint pipe and 190 LF of 36" encasement pipe.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Unfortunately, due to the urgency of the project, we are unable to extend the bid schedule.</p>""19095fe9-ecfb-4b76-954d-57ac23723b76""2026-10-02T18:11:02.634Z"false"<p>The Geotech report has been uploaded. </p>""50845d33-9aa4-4d98-9c83-e38576cf7bbd""2026-10-02T20:50:25.563Z"false"<p><span style=\"color: rgb(33, 94, 153);\">CAD files will be provided after award of contract, with approval of the Client.</span></p>""f6827759-4cbd-4ade-9a5d-780a115bcd38""2026-10-09T20:43:37.493Z"false"<p> KMZ file has been uploaded in Civcast.</p><p></p>""7249ccdc-4f61-498f-9acd-deb9eadaa2ce""2026-10-09T20:46:29.138Z"false"<p>Please refer to the General Notes on Sheet 2, specifically “Temporary Vegetative Stabilization” and “Permanent Vegetative Stabilization” for seeding specifications. For topsoil specifications, please refer to City of Austin Standard Specification 510, Section 510.2(6) as noted on Sheet 33, Detail 510S-5.</p>""4627c69b-9715-4267-a16b-c33897ba9523""2026-10-09T20:46:55.977Z"false"<p>Bid Item for the connection Sta. 140+74 has been added. </p>""32df6638-9dfa-44bb-936e-a8573ee6e9fa""2026-10-09T20:47:13.355Z"false"<p>Construction water will be available through bulk water purchase from WTCPUA during non-drought conditions. In drought conditions, a waiver to purchase bulk water may be obtained from the WTCPUA. Contractor shall coordinate with Engineer and/or WTCPUA staff as necessary if such a waiver is required.</p>""8aaffd88-6852-4647-9909-3db0f07be96a""2026-10-09T20:47:29.165Z"false"<p>Matting is not used over topsoil in this project. Please refer to the plans.</p>""666375c2-c7f9-4af9-a2d6-4af35a124151""2026-10-09T20:47:45.981Z"false"<p>At this time, revegetation bonds are not accepted by the WTCPUA. This answer may change over the duration of the Project, and Contractor is encouraged to revisit this question during construction.</p>""914ec83a-768b-4a68-9cb2-f6ee37a19dac""2026-10-09T20:48:09.833Z"false"<p>Hays County, City of Dripping Springs and WTCPUA.</p>""dd94c58b-32ab-454b-aa63-c8159b4714ac""2026-10-09T20:48:27.891Z"false"<p>City of Dripping Springs Site Development Permit, Hays County Class A Permit, and TCEQ construction permit will be obtained by Engineer prior to construction; all other required permits (SWPPP, etc) shall be coordinated by the Contractor.</p>""aade121e-4c44-47d4-9cac-f9c83dc156c1""2026-10-09T20:48:43.393Z"false"<p>There are no BABA requirements for this project. </p>""ba0be3e3-bbca-437c-946b-d1c0de42af00""2026-10-09T20:48:57.885Z"false"<p>Please refer to the Contract and Specification (Section 01400 Part 1.04).</p>""1a09e449-ff87-44c3-a6ad-86a8556a2116""2026-10-09T20:49:13.364Z"false"<p>Please refer to Article 7 of Standard General Conditions of the Construction Contract.</p>""dbb259a4-6987-4686-9bdb-447e98ee21c2""2026-10-09T20:49:26.656Z"false"<p>Please refer to the Contract and Specification (Section 01500 Part 3.02).</p>""7cdd586e-7911-46fe-927c-95cbf07a0022""2026-10-09T20:49:45.835Z"false"<p>Please refer to the Spoils Management and Disposal Notes on Sheet 02.</p>""42a4c65f-3e74-4f58-9e5f-a96b5499095a""2026-10-09T20:50:01.774Z"false"<p>Please refer to the Spoils Management and Disposal Notes on Sheet 02.</p>""af78b315-15fa-4f29-9aee-168459024787""2026-10-09T20:50:15Z"false"<p>Please refer to the plans and Contract and Specifications for the work to be performed. Any removal required that is not shown on the plans must be coordinated with the Engineer prior to removal, and may necessitate a change order.</p>""88e6cead-4a2f-4aa1-b47c-008358b16774""2026-10-09T20:50:29.972Z"false"<p>Please refer to the Erosion/Sedimentation Control Notes on Sheet 02.</p>""989f1c72-2977-4c70-8fc7-d648582bc4f4""2026-10-09T20:51:13.592Z"false"<p>No, topsoil strip and respread is not required on all areas disturbed. However, please refer to Appendix P-1 Erosion Control note on Sheet 02.</p>""c450911c-a443-4378-94a2-cac4dd98a523""2026-10-09T20:51:32.49Z"false"<p>Please refer to the Plan set. Contractor can utilize the entire Limits of Construction as indicated on the plans.</p>""7a12bf33-f339-494c-ba38-07aa798c1abb""2026-10-09T20:51:50.16Z"false"<p>Please refer to encasement detail included as part of Addendum 01.</p>""e7d65708-9a9e-40d9-b63b-c4721d25a9dc""2026-10-09T20:52:07.132Z"false"<p>Only trees specifically called out for removal shall be removed. See Sheet 36 for the full tree list.</p>""60068578-a8ba-4849-96e6-821dc5dda174""2026-10-09T20:52:20.926Z"false"<p>Please refer to Standard Detail No. 511-AW-03 on Sheet 33 of the plan set.</p>""0773f81e-f94f-48dc-ab9f-22cfbe7e22bd""2026-10-09T20:52:35.381Z"false"<p> Please refer to Standard Details No. 510S-3 and 510S-5 on Sheet 33 of the plan set.</p>""d84e430c-647d-491c-a1f0-49acbf2fb2c0""2026-10-09T20:53:03.53Z"false"<p>Budget/OPCC will not be provided.</p>""af27359b-fa45-4c11-8da0-7df3bafce8d8""2026-10-09T20:53:17.265Z"false"<p>Please refer to Standard Details No 510S-3 and 510S-5 on Sheet 33 of the plan set.</p>""b814e2d7-9a92-43c2-9a33-3106daa9ae85""2026-10-09T20:53:30.786Z"false"<p>Contractor to field verify gravel sizing and material prior to replacement.</p>""a06d2b6a-8c8c-45bc-9f8d-37562cea9a68""2026-10-09T20:53:47.942Z"false"<p>Notice to proceed is anticipated in late October or early November, pending receipt of construction permits.</p>""1554f1e8-2468-400d-b96c-3ec64efa143f""2026-10-09T20:54:01.969Z"false"<p>20” HDPE is to be constructed by separate contract, and will be in place prior to connection. This portion of the “CCTM Seg 3” project is to be bored under the creek via Horizontal Directional Drill, and is daylighting outside of the permanent easement/within the temporary LOC shown on Sheet 30. Contractor for this project will need to connect to HDPE within the existing easement (at approximately 10 feet depth), and all HDPE waterline extending past the point of connection to the southwest will be abandoned in place. Proposed plan and profile of the “CCTM Seg 3” bore is included in Addendum 01 to assist in visualizing how connection is to be made.</p>""c7afacb2-2526-46b6-bc3c-f61a5c2b81ee""2026-10-09T20:54:27.738Z"false"<p>Please refer to the Addendum posted. Quantity has been updated to show 22 gate valves.</p>""2404aeeb-d782-4e58-9509-6fcb710283a7""2026-10-09T20:54:42.146Z"false"<p>Please refer to West Travis County PUA Water and Wastewater Utility Note 20 on Sheet 2 of the plan set: finder wire is only required for non-metallic lines.</p>""0064977a-2108-44f7-8491-19bcd2a16e26""2026-10-09T20:55:00.131Z"false"<p>Only the crossing of Ranch Road 12 (Sheet 31) is to be bored. Floodplain crossings on Sheets 15 and 25 are to be encased per TCEQ requirements, but are not required to be bored. Encasement pipe has been delineated in the bid form; see Addendum 01.</p>""a2c4aa66-9cd3-431e-b9b3-137ed60bf36e""2026-10-09T20:55:14.688Z"false"<p>There are no BABA or other domestic requirements for this job.</p>""b6358745-2f42-4b43-985c-2b0dfe4715bb""2026-10-09T20:55:29.785Z"false"<p>Please refer to Standard Details No 510S-3 and 510S-5 on Sheet 33 of the plan set.</p>""0c3623e4-f08c-4f57-8ae1-bbe40b6e3bd9""2026-10-09T20:55:43.768Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.