The work consists of approximately 4,898 linear feet of 24-inch (24”) cured-in-place pipe installation; 590 linear feet of 30-inch (30”) cured-in-place pipe installation; 161 linear feet of 36-inch (36”) cured-in-place pipe installation; 458 linear feet of 42-inch (42”) cured-in-place pipe installation; 16 root removal/fixed obstructions; 16 removal/cut gaskets; various repairs to 117 storm sewer manholes; various repairs to 39 inlets; and heavy cleaning of approximately 655 linear feet 24-inch (24”) storm pipe, 90 linear feet of 30-inch (30”) storm pipe, 11 linear feet of 36-inch (36”) storm pipe, 3 linear feet of 42-inch (42”) storm pipe, and 3 linear feet of 54-inch (54”) storm sewer pipe.
Type of work: storm sewer rehab
Pre-bid meeting: October 13, 2026 at 10:30 AM (Chicago) — teleconference
Bid opening: October 20, 2026 at 10:30 AM (Chicago) — 1575 Sawdust Road, Suite 400, The Woodlands, Texas 77380
Questions asked: 4
Bid documents (download requires a free CivCast account):
The work consists of approximately 4,898 linear feet of 24-inch cured-in-place pipe, 590 linear feet of 30-inch cured-in-place pipe, 161 linear feet of 36-inch cured-in-place pipe, and 458 linear feet of 42-inch cured-in-place pipe installation, plus 16 root removal/fixed obstructions, 16 removal/cut gaskets, various repairs to 117 storm sewer manholes and 39 inlets, and heavy cleaning of 24-inch through 54-inch storm pipe.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>There is no cost estimate available at this time. </p>""87da0bfe-233d-4442-8633-e8d3bbc4c187""2026-10-05T12:26:06.48Z"false"<p>Pre-televising will be the responsibility of the contractor per the bid item descriptions. </p>""31f26102-2646-4b83-8bcb-a50a308fc0d2""2026-10-05T14:46:53.806Z"true"<p>To clarify, the owner can provide CCTV videos from the previous Cleaning & Televising project for the lines that are designated to be rehabbed via CIPP, but any additional pre-CCTV for those lines will be the responsibility of the contractor. </p>""8e44980e-e8ed-4abc-ad62-631fe841b9d4""2026-10-05T16:22:20.894Z"false"<p>There are no liquidated damages in this contract. Refer to the General Conditions for the Damages section.</p>""b156b1be-f970-4051-9a70-7bf8ba887729""2026-10-06T15:33:28.787Z"false"<p>The Qualification Statement is part of the required documents that must be submitted with the Contractor's bid, as outlined in the Instructions to Bidders in Section 12.0. </p>""641fd487-59be-45b3-a3b1-34dfca3750ea""2026-10-08T13:44:15.82Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6abe902e6159bdec00d21828), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.