We'll email you new plumbing opportunities in Texas as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Pre-bid meeting: October 1, 2026 at 10:00 AM (Chicago) — Elevation Land Solutions - Teleconference — Or call in (audio only) +1 469-965-2602 Phone Conference ID: 693 575 567#
Bid opening: October 8, 2026 at 10:00 AM (Chicago) — Elevation Land Solutions - Teleconference — Or call in (audio only) +1 469-965-2602 Phone Conference ID: 576 315 880#
Questions due: October 6, 2026 at 12:00 PM (Chicago)
Questions asked: 7
Bid documents (download requires a free CivCast account):
"<p><span style=\"color: black;\">Collector bid items refer to work on Mavera Overlook Loop. Any offsite shown in Sec 17 plans are accounted for in the quantities for Sec 16 since these are being bid as a combined project</span></p>""dff46b57-72d0-492f-9412-c27582c1f13e""2026-09-29T21:46:17.08Z"false"<p><span style=\"color: black;\">November 2026.</span></p>""39e5db91-3461-45a0-8e5a-b953b3cd810e""2026-09-30T13:53:15.724Z"false"<p>The quantity has been included in Addendum No. 1.</p><p></p>""fd41482b-e075-4d78-b781-076ec20fcc28""2026-10-02T14:17:59.315Z"false"<p>The water line connection to the water plant has been revised from 8 inches to 16 inches on Sheet 22 of the Section 17 plans issued with Addendum No. 1. The sanitary service drop quantity has been rechecked and confirmed as accurate. Some drops appear in profile view on multiple sheets, but should not be counted twice.</p><p></p>""fa119a5c-dc07-4eee-b1ce-5d7385437dc1""2026-10-02T14:18:17.979Z"false"<p>The quantity was rechecked and remains unchanged. The lead at sanitary manhole "F2" may appear as a near-side lead, however it crosses under pavement and is correctly quantified as a far-side lead.</p><p></p>""1941dc27-ec9a-41f6-94f9-373305ffb871""2026-10-02T14:18:32.565Z"false"<p><span style=\"color: black;\">Water service leads are not required as part of this bid.</span></p>""7ea6217a-4b63-49de-9414-979c2544c963""2026-10-06T20:31:45.179Z"false"<p><span style=\"color: black;\">Section 16 proposes only the two blowoffs shown in the bid form: one at the West end of Magnolia Haven Drive and one in front of the water plant site. Please review the plan callouts for clarification on which blowoffs will not be required due to the continuous construction of Sections 16 and 17</span></p>""f4d7763c-2c6a-40fc-824d-c1ada321b7a8""2026-10-06T20:31:20.194Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab59c3a1c6b6c31cfa0d24d), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.