The work under this Contract generally consists of furnishing and installing a new 250 kW Diesel Powered Generator with concrete foundation, a new electrical rack with an Automatic Transfer Switch and a VFD for the 150 HP well pump, and a new compacted flexible driveway to service the generator.
Type of work: Electrical Generator
Engineer's estimate: 250,000
Bid opening: October 20, 2026 at 2:00 PM (Chicago) — City Hall, 1001 Carter Street, Asherton, Texas 78827
Questions asked: 4
Bid documents (download requires a free CivCast account):
The work under this Contract generally consists of furnishing and installing a new 250 kW Diesel Powered Generator with concrete foundation, a new electrical rack with an Automatic Transfer Switch and a VFD for the 150 HP well pump, and a new compacted flexible driveway to service the generator.
We post new generators opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Please submit 5 references for Cities who have used a Aksa Generator. </p>""b6d18564-32f2-4721-ad64-583f2653fc4b""2026-10-02T17:03:36.952Z"false"<p>American made generators are preferred. Engineer Approved Equals can be submitted for review. </p>""5dd5962d-cc22-48d5-b781-1b9f4f47164c""2026-10-02T17:06:25.036Z"false"<p class=\"ql-align-justify\">On Spec Section 16100-2 the current acceptable manufacturers include:</p><p class=\"ql-align-justify\"></p><p class=\"ql-align-justify\"> Holt Caterpillar</p><p class=\"ql-align-justify\"> Cummins</p><p class=\"ql-align-justify\"> Kohler</p><p class=\"ql-align-justify\"> Taylor Power Systems</p><p></p>""dd4c5927-df57-450a-a69d-569cb56b866f""2026-10-02T17:30:50.567Z"false"<p>250kW Generator intended, we will fix the Specifications to reflect 250kW.</p>""8a13bfc8-9d15-4792-b463-fbd1c59c92d8""2026-10-02T17:04:54.331Z"false"<p>Contract time is 300 calendar days to Substantial Completion and 330 calendar days to final completion. The 180 calendar day reference in the Bid Form will be corrected in Addendum No. 1.</p>""4c52fce6-fc99-44a8-9f12-b55179018c94""2026-10-05T19:27:02.904Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab56ca8d31452730be57fec), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.