Proposer agrees to furnish all equipment, materials, labor, supervision, and insurance for the procurement of the Transformers and Vacuum Circuit Breakers required for the Wylie WTP Backup Power Improvements project. Scope is described in the following documents:
Type of work: Transformers and Vacuum Circuit Breaker Equipment
Pre-bid meeting: October 1, 2026 at 10:00 AM (Chicago) — Microsoft Teams — Please attend this mandatory Pre-Proposal Conference for the Wylie WTP Backup Power Improvements Projects Early Procurement Work Packages: Work Package 1.1 Transformers and Vacuum Circuit Breakers Work Package 1.2 Packaged Generator and Switchgear Sets Attendance by a representative of your firm is required. Firms that do not attend the mandatory Pre-Proposal Conference will not be considered in accordance with the bidding documents. We appreciate your interest in the project and look forward to your participation. Meeting ID: 253 931 979 683 857 Passcode: 6gU9JC2E
Bid opening: October 20, 2026 at 2:00 PM (Chicago) — Online Delivery
Questions due: October 13, 2026 at 6:00 PM (Chicago)
Questions asked: 5
Bid documents (download requires a free CivCast account):
The Proposer agrees to furnish all equipment, materials, labor, supervision, and insurance for the procurement of the Transformers and Vacuum Circuit Breakers required for the Wylie WTP Backup Power Improvements project. The scope is described in the following documents: Work Package 1.1 Early Procurement - Transformers and Vacuum Circuit Breakers, IFB Drawings, and IFB Specifications.
We post new electrical opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p><span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">Proposer shall assume 10FT spacing between gear. Reference the Pre Proposal Conference Agenda, uploaded under bid documents, for the preliminary Switchgear Bldg Layout exhibit. Note that all gear faces the same direction.</span></p>""70406e35-cda7-434b-9160-18e817a65f60""2026-10-07T16:47:17.466Z"false"<p>All remote manual control will be via the Primary and Redundant Master Control Panels (HMI). Additional remote panels with physical breaker control switches are not required.</p>""264f8320-f94b-40ff-99d0-3f582937ccc4""2026-10-02T13:55:51.36Z"false"<p>The preproposal conference attendance report has been uploaded to the Bid Documents folder</p>""268fa124-857e-4800-b1fd-b972284be9f3""2026-10-05T15:57:17.119Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Reference scope of work inclusion item 2: For Contract Specification Sections 00 & 01, when reference is made to CMAR, statements will apply to the Proposer for this contract. </span><span style=\"background-color: rgb(255, 255, 255); color: black;\">The sample subcontract stipulates these requirements of the proposer as well.</span></p>""b57eaffd-5373-4743-b6ee-6e30dac216f6""2026-10-09T13:34:08.695Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6ab181ab9332faf433ff95f6), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.