Please see Technical Specification for complete scope.
A. Remove existing Air Release Valve and Replace with new Vent-O-Mat ARV or approved equal.
Proposed 4” ARV’s a. South Line ARV 7 b. South Line ARV 8 c. South Line ARV 9 d. South Line ARV 10 e. South Line ARV 11 f. South Line ARV 12 g. South Line ARV 13 h. South Line ARV 14 i. South Line ARV 15 B. Furnish and Install Galvanized Vent Piping.
Paint all piping in the manhole and above grade.
C. Furnish and Install and paint Steel Bollards.
D. Furnish and Install HDPE Manhole Inflow Protectors made by ESL Utility & Municipal Products or approved equal.
E. Furnish and install anti-corrosion wrap on existing header, existing plug valve, and proposed Air Valve.
F. Furnish and Install identification sign.
Type of work: Construction
Pre-bid meeting: September 30, 2026 at 1:00 PM (Chicago) — Thomas S. Mackey Water Treatment Plant, 4001 5th Avenue North, Texas City, Texas, 77591 — Pre-Bid Meeting is Non-Mandatory
Bid opening: October 13, 2026 at 2:00 PM (Chicago) — Virtually, via CivCast: Meeting ID: 277 666 669 147; Meeting Password: D7LZ3LE7. Dial In by phone: +1 872-242-9941; phone conference ID 413 388 653# — Bidders shall submit their bids electronically, via Civcast. All Bids must be submitted before the specified deadline outlined above. The Bid will be opened publicly and read aloud. The public bid opening shall be held via TEAMS video conference. Public may also attend the bid opening in person at 4243 Emmett F. Lowry Expressway, Texas City, Texas 77591. Bids received after the deadline will not be accepted.
Questions due: October 5, 2026 at 12:00 PM (Chicago)
Questions asked: 1
Bid documents (download requires a free CivCast account):
A. Remove existing Air Release Valve and Replace with new Vent-O-Mat ARV or approved equal. Proposed 4” ARV’s: South Line ARV 7, 8, 9, 10, 11, 12, 13, 14, 15. B. Furnish and Install Galvanized Vent Piping. Paint all piping in the manhole and above grade. C. Furnish and Install and paint Steel Bollards. D. Furnish and Install HDPE Manhole Inflow Protectors made by ESL Utility & Municipal Products or approved equal. E. Furnish and install anti-corrosion wrap on existing header, existing plug valve, and proposed Air Valve. F. Furnish and Install identification sign.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p><span style=\"background-color: white; color: black;\">Thank you for your clarification request regarding South Line Air Relief Valve Replacement - Phase 2.</span></p><p></p><p><span style=\"color: black;\">At this time, we are unable to provide the requested estimate, as it has not yet been determined.</span></p>""75cba542-deaa-4ce1-9a76-ddfbb6e2354f""2026-09-23T15:01:49.562Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.