We'll email you new plumbing opportunities in Texas as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Work generally includes the expansion of the existing wastewater treatment plant from 150,000 gallons per day to 300,000 gallons per day, including but not limited to: Addition of one (1) 52-Foot x 12-Foot x 13-Foot 2-Inch aeration basin; Addition of one (1) 52-Foot x 12-Foot x 13-Foot 2-Inch digester basin; Modifications to electrical for expansion components; Modifications to the NPW system piping; Relocation of electrical utility service drop.
Pre-bid meeting: September 17, 2026 at 10:00 AM (Chicago) — Microsoft Teams or office of Odyssey Engineering Group — Remotely via Microsoft Teams or in person at the office of Odyssey Engineering Group
Bid opening: October 8, 2026 at 10:00 AM (Chicago) — Microsoft Teams or office of Odyssey Engineering Group — Remotely via Microsoft Teams or in person at the office of Odyssey Engineering Group
Questions due: October 5, 2026 at 10:00 AM (Chicago)
Questions asked: 22
Bid documents (download requires a free CivCast account):
Work generally includes the expansion of the existing wastewater treatment plant from 150,000 gallons per day to 300,000 gallons per day, including but not limited to: Addition of one (1) 52-Foot x 12-Foot x 13-Foot 2-Inch aeration basin; Addition of one (1) 52-Foot x 12-Foot x 13-Foot 2-Inch digester basin; Modifications to electrical for expansion components; Modifications to the NPW system piping; Relocation of electrical utility service drop.
"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">No, basins may need to be lowered but nothing needs to be totally empty</td></tr></tbody></table><p></p>""0a482634-27aa-400c-ae1f-97394186d944""2026-09-29T14:27:07.268Z"false"<p>We will not be relocating the headworks (see question 6)</p>""6e5f0d8c-98ef-4cd2-8c24-4a75a3f3e0f9""2026-10-05T16:48:44.157Z"true"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\"> At this time we will not accept new manufacturers for inclusion. Please contact Jennifer Elms or Philip Huseman to set up a time to discuss future inclusion.</span></p>""98a71ca9-c840-4655-973c-eb61d3448ec0""2026-10-05T16:54:47.277Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Just pumps being replaced</td></tr></tbody></table><p></p>""e2a83540-d4a3-4185-9641-4688d6a7d539""2026-09-29T14:27:55.348Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Addendum 2 corrects Attachment A to the Blower Specification - Blowers are 40HP</td></tr></tbody></table><p></p>""3439e280-402c-4d67-ab69-940ac979b083""2026-09-29T14:28:06.839Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Addendum 2 corrects Attachment A to the Blower Specification -Only two (2) new blowers are required.</td></tr></tbody></table><p></p>""e1a1e033-3280-4fff-80d3-0623f6d5ab47""2026-09-29T14:28:18.527Z"false"<p>We will not be relocating the headworks.- Bid proposal will be revised.</p>""d7f2e093-355f-4237-96fb-405c63e2ae55""2026-10-05T16:40:30.424Z"false"<p>The top of foundation has to match that of existing (48.5) and the foundation should be compacted to 95% standard proctor density; +/- 2% of Optimum Moisture;</p>""8de859ca-c3db-4bec-b48a-6fc7dd8135d4""2026-10-05T16:47:45.337Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Intended to be contractor furnished and installed. The District is not leasing this expansion.</td></tr></tbody></table><p></p>""8f874fdb-ffc3-4eb7-8a1f-d73f7738c015""2026-09-29T14:29:00.553Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Geotech reports will be uploaded with Addendum 2</td></tr></tbody></table><p></p>""1b9d78f1-8b55-4e83-8c4c-2c8e282cf101""2026-09-29T14:29:15.505Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\"> Contact Robin Deville at 281 639 0417. She is on vacation week of Sept 21</td></tr></tbody></table><p></p>""54fdad75-bbee-4409-b721-4ae2b4ff6b55""2026-09-29T14:29:36.609Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">OEG did not design phase 1 - we don’t know what the original blower specifications call for; Addendum 2 corrects Attachment A to the specification for clarification of the blower requirements.</td></tr></tbody></table><p></p>""53b6c2b7-2f6a-4002-967d-0adc4396b5ae""2026-09-29T14:29:48.087Z"false"<p>We will not be relocating the headworks (see question 6)</p>""41d6abb5-4311-45df-896c-eaf79c4d00b8""2026-10-05T16:49:50.03Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">OEG did not design phase 1 - we don’t know what the original coatings criteria were. A coatings specification is included in the project</td></tr></tbody></table><p></p>""04c64df0-ce8d-4823-9f9d-fa300b943819""2026-09-29T14:30:03.907Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">The existing blowers are Continential. We would like to have the same blower so the operator only has to keep parts for one manufacturer. At this time we will not accept new manufacturers for inclusion.Please contact Jennifer Elms or Philip Huseman to set up a time to discuss future inclusion.</td></tr></tbody></table><p></p>""aa35df8c-9e40-45bd-92b2-2eabe6bcb9a5""2026-09-29T14:30:19.207Z"false"<table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">We are not adding or modifiying the clarifier.The entire plant layout is provided for information of exisitng conditions.</td></tr></tbody></table><p></p>""0c1aae62-771a-4f21-b88f-c6ccac657925""2026-09-29T14:30:40.424Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">EATON</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Pnl Type: PRL2X </span>\t\t\t\t\t\t\t\t<span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Pnl Amps: 600A</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Volts: 480Y/277V</span>\t\t\t\t\t\t\t\t<span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Phase: 3/Wire: 4</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Neut Cat: 1C96652G06</span>\t\t\t\t\t\t<span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Neut Amps: 600</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Date: 02/08/2022</span>\t\t\t\t\t\t\t\t<span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Neut. Volts: 277</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Box Cat: EZB2090R</span>\t\t\t\t\t\t\t<span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Box Type: 1</span></p><p><span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Job No: PRL2X3600X42CL</span>\t\t\t\t<span style=\"background-color: rgb(255, 255, 255); color: rgb(36, 36, 36);\">Mfdg At: JRZ</span></p><p></p>""b813ca5c-87a1-4c7d-a7aa-8db0a8c88f82""2026-09-29T15:59:43.269Z"false"<p>Yes, the lift station pumps are being replaced. Due to existing conditions, Flygt pumps have been selected.</p>""ce41aa0a-739e-4325-b223-38b841299ba1""2026-09-29T16:23:25.221Z"false"<p>Neither, No new chlorination building is proposed.</p>""582f8bb8-53e6-4b2e-aa73-7efeb99dd60b""2026-09-29T16:24:44.021Z"false"<p><span style=\"color: rgb(0, 0, 0);\">Conduits PWR-100 and PWR-101 shall be new 3" conduits containing 3-500 KCMIL (aluminum) + #4/0 neutral (aluminum). The existing 600A fuses will remain. An addendum will be issued to revise the Contract Documents accordingly.</span></p>""29871c63-a5d7-4676-995b-62d7bbfc87ba""2026-10-05T20:07:25.957Z"false"<p>Correct, I have verified with the operator that we prefer Flygt pumps. The operator already has spare parts and things to work with Flygt</p>""a3de103a-0989-4a44-83c8-908cd5d96ec1""2026-10-06T13:07:31.617Z"false"<p>Not at this time, I have verified with the operator that we prefer Flygt pumps. The operator already has spare parts and things to work with Flygt</p>""403ff961-2193-4ec5-80d3-2fae377e2e42""2026-10-06T13:07:33.171Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a9824983560f6e5c5b6a8cf), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.