We'll email you new electrical opportunities in Texas as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Pre-bid meeting: September 10, 2026 at 3:00 PM (Chicago) — Water Plant No. 1 @ 2031 Clover Field Drive
Bid opening: October 21, 2026 at 11:00 AM (Chicago) — JNS Engineers, LLC 722 Pin Oak Road, Suite 202A Katy, Texas 77494
Questions asked: 23
Plans and Specifications will be available by September 11, 2026.
Bid documents (download requires a free CivCast account):
"<p>No cost estimate </p>""d27fba70-c93a-42f9-bb9b-1ac1d04c8a3d""2026-10-15T21:40:48.166Z"false"<p>Drawings and Specs have been uploaded.</p>""04bd402b-b96b-4f7d-b279-a34615c111d7""2026-10-06T19:19:12.638Z"false"<p>The Pre-Bid was not mandatory.</p>""f5a798ea-e874-4329-8b67-f3bdbccc2a2c""2026-10-06T19:19:27.151Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Drawings and Specs have been uploaded.</span></p>""8e081306-0e0f-48e9-bb00-3f14051b0b09""2026-10-06T19:19:43.84Z"false"<p>Please refer to Addendum No. 3.</p>""2047d320-2342-4495-ab9e-0cb4bda0b45e""2026-10-12T19:18:25.13Z"false"<p>The additional pre-bid meeting on 10/14/26 was not mandatory.</p>""3888833f-6687-4fb2-a613-e07edc7f75a2""2026-10-15T21:41:24.725Z"false"<p>This was addressed with Addendum No. 5 issued on 10/15/26.</p>""4a445c8b-efdf-41ac-81a7-73e4c4202aa4""2026-10-15T21:43:19.16Z"false"<p>Building foundation details added to construction drawing sheet 13 as part of Addendum No. 5.</p>""d33d6ca0-cc17-4d59-8506-4ba620ed1d6d""2026-10-15T21:45:04.653Z"false"<p>This will be discussed during construction.</p>""a7358002-0390-4f93-b787-72e39613d333""2026-10-15T21:46:07.499Z"false"<p>Double doors to accommodate the LAS chemical tank. </p>""035fce30-3f3e-46b3-8099-1b794c5d6ede""2026-10-15T21:48:48.15Z"false"<p>New ATS</p>""0e660cbd-462e-421c-86a5-02a241dca404""2026-10-15T21:46:39.15Z"false"<p>Use Addendum No. 5 bid forms.</p>""bc935737-8347-42a0-88a4-36b0fb753cf9""2026-10-15T21:49:54.999Z"false"<p>This has been corrected in the latest addendum.</p>""c27a1c04-4db6-42f0-a492-feb928437da4""2026-10-20T12:42:09.931Z"false"<p><span style=\"background-color: rgb(255, 255, 255); color: rgb(60, 64, 67);\">Bid Opening has been postponed to Wednesday, October 21st.</span></p>""47965582-d123-4bcf-a7f1-05c09c37c640""2026-10-20T12:40:46.563Z"false"<p>Bid Opening has been postponed to Wednesday, October 21st.</p>""3ca75978-cc2a-4e6b-aa45-ad63589f82a3""2026-10-20T12:40:03.356Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a919ca7984920c76fcb291e), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.