** INVITATION TO BIDDERS**
Sealed bids, in duplicate, addressed to Board of Directors, Harris County Municipal Utility District No. 287,** **will be received at the office of BGE, Inc., 10777 Westheimer, Suite 500; Houston, Texas, 77042 (Phone: 281-558-8700) **OR **electronically through www.civcastusa.com, until 10:00 AM Local Time, Tuesday, October 13, 2026, at which time all bids will be opened and publicly read at the office of BGE, Inc. and through Microsoft Teams. **The Call-in number is (832) 680-2579 and the Conference ID is 916 718 808# **for the furnishing of all material, equipment, labor and supervision necessary or incidental to “Construction of Wastewater Treatment Plant 0.8 MGD for Harris County MUD No. 287, Harris County, Texas.” Scope of Project:
Bids received after closing time will be returned unopened.
A MANDATORY pre-bid conference will be held on Thursday, September 17, 2026, at 9:00 AM Local Time, at Site Location: Wastewater Treatment Plant: 3500 Elrod Road, Katy, Texas 77449 Attendance by each prospective bidder or its representative at the pre-bid conference is MANDATORY, and no Bid will be opened unless the bidder or representative was present at the pre-bid conference.
Plans, specifications and bid documents are available at www.civcastusa.com, search: 14158-00.
A Bidder submitting Electronic Bids must submit its Bid and bid securities in compliance with Owner’s Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and bid securities must be submitted through www.civcastusa.com. By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature in accordance with Owner’s **Electronic Signature Rules **for Construction Contracts.
A cashier’s check or bid bond in the amount of **2% **of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.
Pre-bid meeting: September 17, 2026 at 9:00 AM (Chicago) — On Site at Wastewater Treatment Plant: 3500 Elrod Rd, Katy, TX 77449 — This meeting is MANDATORY.
Bid opening: October 13, 2026 at 10:00 AM (Chicago) — BGE, Inc., 10777 Westheimer, Suite 500; Houston Texas, 77042 (Phone: (281) 558-8700) — OR electronically through www.civcastusa.com
Questions due: October 8, 2026 at 10:00 AM (Chicago)
Questions asked: 22
Contractor is required to submit TEC Form 1295 (Certificate of Interested Parties) with their bid. If plans, specifications and bid documents are not initially available for download, they will be available for review at the office of the Engineer. The Front Office and Receptionist Desk are located on the 5th floor (Suite 500).
Bid documents (download requires a free CivCast account):
The project involves furnishing all materials, labor, equipment, and incidentals required for the construction of a permanent 0.8 MGD concrete wastewater treatment plant, as well as the phased decommissioning and removal of the existing 0.8 MGD leased steel packaged wastewater treatment plant from the site. All work performed shall be in accordance with the plans and specifications, complete in place.
We post new plumbing opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>All items are now uploaded.</p>""a3e69018-596f-460c-889e-820829c08597""2026-08-31T14:07:47.408Z"false"<p>Addendum No. 1 will be issued to include the prevailing wage. Addendum No. 1 will be issued during the week of Sept 21st. </p>""b767edf4-8385-488b-9c42-f2881b89c324""2026-09-15T17:20:51.687Z"false"<p>The existing WWTP electrical service will remain active during construction. Electricity consumed through the facility's existing electrical service for operation of the WWTP will be paid by the Owner. Any temporary electrical service, generators, fuel, or other temporary power required solely for the Contractor's means and methods shall be provided at the Contractor's expense. The contractor shall obtain a meter from the District Operator for water that is used during the project, and Contractor shall be responsible for all costs associated with construction water they use. </p>""f02e1b40-ac38-4e21-a5d0-addfdbc7b731""2026-09-15T17:21:17.626Z"false"<p>Contractor shall be responsible for obtaining all permits required for construction and shall pay all associated permit fees. Refer to the Harris County Engineering and Harris County Flood Control District review sheets included in the plans for applicable permit requirements. </p>""cc5825b8-c010-4c8a-a229-817004e85864""2026-09-15T17:21:31.804Z"false"<p>Refer to the Geotechnical Evaluation for HCMUD No. 287 Permanent Wastewater Treatment Plant No. 1 by Ninyo & Moore, dated July 17, 2025, Section 11.2.1, which requires structures to be supported on 4 feet of select fill beneath each structure pads extending a minimum of 5 feet beyond the structure footprint. Structural Drawings Sheets 51 through 58 depict these select fill requirements for the applicable structures.</p><p></p><p>For proposed basin structures (Sheets 32 through 48), Note 3 requires removal and replacement of unsuitable silty material beneath the basin subgrade. If any existing silty material is encountered at the bottom of an excavation for a basin, the Contractor shall excavate and remove the silty material until non-silty soil is encountered and replace the material with compacted select fill.</p><p></p><p>To address this potential condition, Addendum No. 1 will be issued to include Supplemental Bid Item 77A for payment of select fill replacement associated with removal of silty material encountered during construction. </p>""fc71e023-dc2d-45c7-900c-4ddf64bcff4e""2026-09-15T17:23:36.31Z"false"<p>Refer to sheets 28, 29 and 73 to view route of 12” RS. The 12” will turn south to connect to the existing piping above grade under the fine screen platform. Proposed piping should run underground and turn up 90 degrees to connect to the proposed flow meter 4-feet above grade (as shown on sheet 73). After the proposed flow meter, connect to the existing piping leading up to the existing fine screen.</p>""89231742-46d2-4e26-a199-81636cba4d55""2026-09-15T17:23:59.352Z"false"<p>Yes, bypass pumping will be required. The proposed clarifier 16-inch effluent flowline exits the launder trough at elevation 138. The existing steel chlorine contact basin has a normal water surface elevation of approximately elevation 142 and a top of wall elevation of approximately elevation 144. </p>""2ee1d6fe-29e7-45e3-a5e7-5a8535b46e29""2026-09-15T17:24:39.891Z"false"<p>Electrical and I&C work specifically identified within other bid items shall be included in those respective bid items. Bid Item 43 shall include the remaining plant Electrical and I&C scope and items as shown within Bid Item 43 that are not specifically included under another bid item. </p>""cd2fa1ba-6775-4d60-833b-f0ffcaff2a5b""2026-09-15T17:24:59.171Z"false"<p>Energy Dissipating Inlets (EDIs) will be required for the clarifiers, and the specifications will be updated accordingly. Note that WesTech is considered an approved equal for this product. The use of a cycloidal drives and manual condensate removal is acceptable, and the specification will be revised to avoid confusion. The bridge and ladder configuration requirements within the specification will be updated to reflect what the drawings show. Revised specification 11224 will be issued as part of Addendum No. 1. </p>""e2a84f96-18a3-430c-9835-74b3df194451""2026-09-17T12:38:05.466Z"false"<p>Project includes two new autosamplers. </p>""4a71d9ce-ea52-4143-932f-e34c793224b4""2026-09-17T12:38:17.412Z"false"<p>Platform is not shown on sheet 87 (the mechanical sheet) for clarity. The platform shall be included as shown on the structural sheets 53 and 53A. </p>""79047c5e-e281-40db-91d8-17340c8b2edc""2026-09-17T12:40:08.932Z"false"<p>The bid opening date will remain as currently scheduled.</p>""3e0008df-d3c7-4ae8-9e70-b4759247fddc""2026-09-24T13:55:12.137Z"false"<p>All six VFDs shown on the contract documents shall be provided by the Contractor, and none are provided by others. The Aeration Blower controls are furnished through the Master Blower Control Panel as part of the blower vendor package, therefore a separate control schematic is not provided on the electrical drawings.</p>""bdcfead2-195f-4928-a582-53f9a8a8acd8""2026-09-24T13:55:15.372Z"false"<p>The proposed 18-inch effluent piping may be PVC and shall conform to the storm sewer PVC material specifications. Plan Sheet 9 identifies PE-301 from the Chlorine Contact Basin effluent to the outfall as PVC, and this material designation shall be applied to all proposed 18-inch effluent piping. </p>""e2e80980-b371-49c5-aa7e-6fa99045d015""2026-09-24T13:55:19.202Z"false"<p>No cement lining is required for process air piping. Buried process air piping shall be ductile iron pipe with polyethylene wrap and fully restrained joints. All above grade process air piping, including at the Aeriation, Digesters and Chlorine Contact Basin, shall be Schedule 40 carbon steel pipe with a galvanized exterior. Addendum No. 2 will include revisions to Plan Sheet 9 to clarify the process air piping material requirements.</p>""1d6666a8-4b46-4272-aba4-a985e020dde6""2026-09-24T13:55:22.315Z"false"<p>Buried process air piping shall be ductile iron pipe without cement lining. All joints shall be restrained, and the pipe shall be provided with polyethylene wrap. Gaskets shall be EPDM or approved equal suitable for process air piping. Addendum No. 2 will include revisions to clarify these requirements.</p>""5690a464-b7fe-4677-81d0-eaf3c4fe6063""2026-09-24T13:55:25.382Z"false"<p>The process air piping for aeration basin shall be Schedule 40 carbon steel pipe with an unlined interior and galvanized exterior. Addendum No. 2 will include revisions to Plan Sheet 9 to clarify the required pipe material and coating requirements.</p>""0952be9f-7916-4321-888e-c59994c23f1f""2026-09-24T13:55:30.625Z"false"<p>Both PV-501 and KGV-602 shall be hand wheel operated valves and are not required to be motor operated valves. Addendum No. 2 will revise Plan Sheet 9 to clarify this valve requirements. Contractors shall base their bids on PV-501 and KGV-602 being provided as hand wheel operated valves.</p>""3d74bdb1-6a29-4412-ba3d-ae71da9a86e5""2026-09-24T18:36:12.092Z"falseRead from this solicitation’s notice text — each row shows the sentence it came from. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a8f0578945188b6aacb52ca), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.