Water, Sanitary Sewer, Storm Sewer, Pavement & Final Grading
Type of work: Water, Sanitary Sewer, Storm Sewer & Pavement
Pre-bid meeting: September 15, 2026 at 2:00 PM (Chicago) — 7102 W Sam Houston Parkway N, Suite 230 Houston, TX 77040
Bid opening: December 15, 2026 at 2:00 PM (Chicago) — 7102 W Sam Houston Parkway N, Suite 230 Houston, TX 77040
Questions asked: 12
It is to be understood that "all paving, subgrade, traffic buttons, striping, and markings shall comply with current Harris County Regulations and Specifications, and must pass inspection by the Harris County Engineering Department (HCED)."
Updated plans to show additional roadways & updated the Bid Document quantities.
Bid documents (download requires a free CivCast account):
The work includes water, sanitary sewer, storm sewer, pavement and final grading for Crosby Terrace Subdivision Section 2. Centerpoint will install dry utilities. The anticipated start date is November/December.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Anticipated start date would be Novermber/December.</p>""01daecbe-1b1c-4396-b201-58e4f5e8d0ff""2026-09-21T14:06:09.109Z"false"<p>Anticipated start date would be Novermber/December.</p>""220c9cfc-9bb9-4a52-a0d9-52da33e58335""2026-09-21T14:06:20.048Z"false"<p>Centerpoint will install dry utilities</p>""f50bd648-3324-41e8-a12b-52cb7c13d660""2026-09-22T13:47:28.041Z"false"<p>The 3-8" above ground ball valves should be called out as 2" blow-off valves.</p><p>Item 46</p>""1028e548-7e99-4739-8436-c0acd5263d27""2026-10-01T20:37:31.621Z"false"<p>Yes</p>""646e7a86-9ec4-4f06-b53d-70bc9c1e7661""2026-10-02T17:24:22.413Z"false"<p>Bid date has been moved to 10-20-2026</p>""0b2b0dd8-e077-4a69-8d69-3375349cd825""2026-10-08T21:28:58.588Z"false"<p>Please use 80' max</p>""efb1fb28-e0cb-401d-ac30-3392a9dc93c9""2026-10-13T16:32:59.912Z"false"<p><span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">An earthwork section will be provided via Addendum #2</span></p><table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Provide all labor, equipment, materials necessary to perform minimal dirt work, roadway excavation, fine grading, and surface stabilization across an area of approximately 1,295,000 square feet (approx. 30 acres).</td></tr></tbody></table><p></p>""330755cd-36a2-493e-b093-3b1658b6a139""2026-10-14T16:28:26.076Z"false"<p>Quantity will be adjusted to 292 tons</p>""5803b29e-3475-4116-b042-12dfcac985e5""2026-10-13T18:22:26.383Z"false"<p>SF can be used for continuity as the concrete and subgrade could have different thickness.</p>""5e2b7d4f-36ed-43e8-81bc-5d7f42cd6753""2026-10-13T18:34:57.981Z"false"<p><span style=\"color: rgb(60, 64, 67); background-color: rgb(255, 255, 255);\">An earthwork section will be provided via Addendum #2</span></p><table style=\"border: 1px solid #000;\"><tbody><tr><td data-row=\"1\">Provide all labor, equipment, materials necessary to perform minimal dirt work, roadway excavation, fine grading, and surface stabilization across an area of approximately 1,295,000 square feet (approx. 30 acres).</td></tr></tbody></table><p></p>""c0671d43-14f2-4d4b-994e-bf4d0c6efe93""2026-10-14T16:28:31.129Z"false"<p>CTS BID DOCUMENT _ ADDENDUM #2 has been posted.</p>""966dc782-ee20-4de1-b53d-45f837360e4b""2026-10-15T19:04:41.637Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6a8db73d31299f4c9b5e12de), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.