Light RFP
Charlotte · Charlotte, NC

Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project

Open — see notice·Plumbing, Paving / SidewalksView official posting ↗
Issuing agency
City of Charlotte — Storm Water Services
Category
Construction
PIN
2026-Q3(Jul-Sep)-CSWS-19057
Location
Charlotte, NC
Posted
Jul 9, 2026
Takeaways by LightRFP AI
  • City of Charlotte Storm Water Services seeks construction for Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project in Charlotte, NC.
  • Work includes replacing an existing 12'x8' CMP with approx. 50 LF of 10x8 RCBC, adding concrete wingwalls, catch basins, junction boxes, asphalt and curb replacement, and tying existing sewer crossing into a separate system.
  • The estimated total project value is $1,000,000–$4,999,999.
  • The anticipated posting date is 2026-09-29.
  • Requirement: Bid Bond – City required Bond to ensure that vendors do not retract bids from the time they submit a bid until the contract has been executed.
  • Requirement: Payment Bond – City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Requirement: Performance Bond – City required Bond to ensure satisfactory completion of a project by the vendor.

AI-generated, verify all details against the official documents.

Description

Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12'x8' CMP and replace with approx. 50 LF of 10x8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH's and approx 30 LF of 8in DIP; 15 LF 15in PVC

Anticipated posting date: 2026-09-29

Requirements

Insurance Requirements
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:Automobile-For automobile operations liabilityConstructions Bonds-For bidding, payment, completion of construction projectsGeneral Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injuryWorkers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements
The City plans to require the following bond(s) for this solicitation:Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value
The total project value is anticipated to be:$1,000,000 -4,999,999

Contract Term
The term of the project is anticipated to be:Through Project Completion

Contact

Name
Colleen Tully
Address
Charlotte, NC
Full source recordfrom City of Charlotte
Dept
CSWS
Slug
Woodland-Dr-2000-Ph-2-Storm-Drainage-Improvement-Project
Title
Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project
Detail
Text
Skip to main content English is your current preferred language. MENU Open Search Search Home / Growth and Development/ Doing Business with the City / Contract Opportunities / Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project Woodland Dr 2000 Ph 2 Storm Drainage Improvement Project Anticipated Posting Date: 2026-09-29 Reference number2026-Q3(Jul-Sep)-CSWS-19057 StatusUpcoming SummaryProject initiated to permanently fix what was an old AFT project. City intends to replace the existing 12'x8' CMP and replace with approx. 50 LF of 10x8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH's and approx 30 LF of 8in DIP; 15 LF 15in PVC Requirements Insurance Requirements Bonding Requirements Estimated Total Value Contract Term Print Page Contact details Colleen Tully Colleen.Tully@charlottenc.gov Bid Details Department: Charlotte Storm Water Services - Construction Commodity Code(s): 74505, 91200, 91244, 91345, 92912, 92915 Related Information Facebook X Back to top Accessibility Policy ADA Accommodations Sitemap Public Records Privacy & Legal Notices Contact Us Subscribe/Notify Me CharMeck Alerts CATS Riders Alerts Social Facebook LinkedIn Twitter Instagram © 2026 City of Charlotte | Powered by Granicus
Contact
Name
Colleen Tully
Email
Colleen.Tully@charlottenc.gov
Requirements
**Insurance Requirements** The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types:Automobile-For automobile operations liabilityConstructions Bonds-For bidding, payment, completion of construction projectsGeneral Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injuryWorkers Compensation-For lost wages and medical expenses of injured workers **Bonding Requirements** The City plans to require the following bond(s) for this solicitation:Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed.Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed.Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor. **Estimated Total Value** The total project value is anticipated to be:$1,000,000 -4,999,999 **Contract Term** The term of the project is anticipated to be:Through Project Completion
Status
Upcoming
Reference
2026-Q3(Jul-Sep)-CSWS-19057
Anticipated
Sep 29, 2026
Description
Project initiated to permanently fix what was an old AFT project. City intends to replace the existing 12'x8' CMP and replace with approx. 50 LF of 10x8 RCBC; Add (2) concrete wingwalls; (4) CBs; (1) JB; Asphalt and curb replacement; Tie existing sewer crossing into a separate system (2) SSMH's and approx 30 LF of 8in DIP; 15 LF 15in PVC
Detail Fetched
Yes

Source: City of Charlotte (opportunity CHARLOTTE_NC-Woodland-Dr-2000-Ph-2-Storm-Drainage-Improvement-Project), retrieved via the City of Charlotte Contract Opportunities portal. View the official posting — always confirm requirements and deadlines with the issuing agency.