Light RFP
Charlotte · Charlotte, NC

McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station

Open — see notice·Demolition / AbatementView official posting ↗
Issuing agency
City of Charlotte
Category
Construction
PIN
2027-Q1(Jan-Mar)-CW-18587
Location
Charlotte, NC
Posted
Jul 9, 2026
Takeaways by LightRFP AI
  • The City of Charlotte is soliciting bids for demolition and disposal of the existing Primary Clarifier No. 5 mechanism and installation of a new Owner-procured clarifier mechanism at the McDowell Creek Wastewater Treatment Plant.
  • Additional work includes structural repairs, replacement of exposed piping and valves, modifications to chemical feed dosing points, and upgrades to slide and sluice gate components at PC No. 5.
  • At the Influent Pump Station, the project involves replacing existing grit piping and stainless steel air piping, and replacing slide gate seals, actuators, and stems.
  • The estimated total project value is $1,000,000 to $4,999,999.
  • The anticipated posting date is 2027-01-01.
  • The contract term is through project completion.
  • Requirement: The City requires the awarded vendor(s) to obtain and maintain insurance coverage types: Automobile, Construction Bonds, Errors & Omissions / Professional Liability, General Liability, and Workers Compensation.
  • Requirement: The City plans to require a Bid Bond to ensure that vendors do not retract bids from the time they submit a bid until the contract has been executed.
  • Requirement: The City plans to require a Payment Bond to ensure that subcontractors and/or suppliers are paid for any work performed.
  • Requirement: The City plans to require a Performance Bond to ensure satisfactory completion of a project by the vendor.

AI-generated, verify all details against the official documents.

Description

This project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism.

Anticipated posting date: 2027-01-01

Requirements

Insurance Requirements
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile-For automobile operations liability Constructions Bonds-For bidding, payment, completion of construction projects Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury Workers Compensation-For lost wages and medical expenses of injured workers

Bonding Requirements
The City plans to require the following bond(s) for this solicitation: Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed. Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed. Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor.

Estimated Total Value
The total project value is anticipated to be: $1,000,000 -4,999,999

Contract Term
The term of the project is anticipated to be: Through Project Completion

Contact

Name
Katherine Osborne
Address
Charlotte, NC
Full source recordfrom City of Charlotte
Dept
CW
Slug
McDowell-Creek-Wastewater-Treatment-Plant-Clarifier-Pumping-Station
Title
McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station
Detail
Text
Skip to main content English is your current preferred language. MENU Open Search Search Home / Growth and Development/ Doing Business with the City / Contract Opportunities / McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station McDowell Creek Wastewater Treatment Plant Clarifier & Pumping Station Anticipated Posting Date: 2027-01-01 Reference number2027-Q1(Jan-Mar)-CW-18587 StatusUpcoming SummaryThis project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism. Additional work at PC No. 5 includes structural repairs, replacement of exposed piping and valves, modifications to existing chemical feed dosing points, and upgrades to slide and sluice gate components. At the Influent Pump Station (IPS), the project involves replacing existing grit piping and stainless steel air piping. The IPS scope also includes the replacement of slide gate seals, actuators, and stems to ensure continued operational reliability. Requirements Insurance Requirements Bonding Requirements Estimated Total Value Contract Term Print Page Contact details Katherine Osborne katherine.osborne@charlottenc.gov Bid Details Department: Charlotte Water - Construction Commodity Code(s): 91200, 91359, 91360, 92597 Related Information Facebook X Back to top Accessibility Policy ADA Accommodations Sitemap Public Records Privacy & Legal Notices Contact Us Subscribe/Notify Me CharMeck Alerts CATS Riders Alerts Social Facebook LinkedIn Twitter Instagram © 2026 City of Charlotte | Powered by Granicus
Contact
Name
Katherine Osborne
Email
katherine.osborne@charlottenc.gov
Requirements
**Insurance Requirements** The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile-For automobile operations liability Constructions Bonds-For bidding, payment, completion of construction projects Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury Workers Compensation-For lost wages and medical expenses of injured workers **Bonding Requirements** The City plans to require the following bond(s) for this solicitation: Bid Bond-City required Bond to ensure that vendors do not retract bids from the time they submit a bit until the contract has been executed. Payment Bond-City required Bond to ensure that subcontractors and/or suppliers are paid for any work performed. Performance Bond-City required Bond to ensure satisfactory completion of a project by the vendor. **Estimated Total Value** The total project value is anticipated to be: $1,000,000 -4,999,999 **Contract Term** The term of the project is anticipated to be: Through Project Completion
Status
Upcoming
Reference
2027-Q1(Jan-Mar)-CW-18587
Anticipated
Jan 1, 2027
Description
This project includes the demolition and disposal of the existing Primary Clarifier No. 5 (PC No. 5) mechanism and associated components, followed by the installation of a new Owner-procured clarifier mechanism.
Detail Fetched
Yes

Source: City of Charlotte (opportunity CHARLOTTE_NC-McDowell-Creek-Wastewater-Treatment-Plant-Clarifier-Pumping-Station), retrieved via the City of Charlotte Contract Opportunities portal. View the official posting — always confirm requirements and deadlines with the issuing agency.