Light RFP
Charlotte · Charlotte, NC

Early Bag Storage Design

Open — see notice·General ConstructionView official posting ↗
Issuing agency
City of Charlotte — Charlotte Douglas International Airport
PIN
2026-Q2(Apr-Jun)-AVI-20780
Location
Charlotte, NC
Posted
Jul 9, 2026
Takeaways by LightRFP AI
  • City of Charlotte — Charlotte Douglas International Airport is seeking statements of qualifications from professional architecture firms for the design of an Early Baggage Storage (EBS) facility.
  • The EBS facility will use an Individual Carrier System (ICS) tote-based storage system integrated with the existing Baggage Handling System (BHS).
  • The facility is anticipated to provide approximately 1,830 storage positions, at least two ramp-level baggage makeup carousels, and a circulation service road.
  • The estimated total project value is $5,000,000 - 9,999,999.
  • The anticipated posting date is 2026-07-27.
  • Requirement: The awarded vendor(s) must obtain and maintain Automobile, Errors & Omissions / Professional Liability, General Liability, and Workers Compensation insurance coverage.

AI-generated, verify all details against the official documents.

Description

Charlotte Douglas International Airport (CLT) anticipates seeking statements of qualifications from professional architecture firms to provide design of an Early Baggage Storage (EBS) facility at Charlotte Douglas International Airport (CLT) to address operational constraints with the existing Baggage Handling System (BHS).

Anticipated posting date: 2026-07-27

Requirements

Insurance Requirements
The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile-For automobile operations liability Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury Workers Compensation-For lost wages and medical expenses of injured workers

Estimated Total Value
The total project value is anticipated to be: $5,000,000 - 9,999,999

Contract Term
The term of the project is anticipated to be: Through Project Completion

Contact

Address
Charlotte, NC
Full source recordfrom City of Charlotte
Dept
AVI
Slug
Early-Bag-Storage-Design
Title
Early Bag Storage Design
Detail
Text
Skip to main content English is your current preferred language. MENU Open Search Search Home / Growth and Development/ Doing Business with the City / Contract Opportunities / Early Bag Storage Design Early Bag Storage Design Anticipated Posting Date: 2026-07-27 Reference number2026-Q2(Apr-Jun)-AVI-20780 StatusUpcoming SummaryCharlotte Douglas International Airport (CLT) anticipates seeking statements of qualifications from professional architecture firms to provide design of an Early Baggage Storage (EBS) facility at Charlotte Douglas International Airport (CLT) to address operational constraints with the existing Baggage Handling System (BHS). The project is intended to improve transfer baggage management, reduce sortation congestion, and enhance overall baggage system resiliency, particularly during irregular operations (IROPs). The proposed EBS facility would use an Individual Carrier System (ICS) tote-based storage system integrated with the existing BHS. The system is anticipated to provide approximately 1,830 storage positions within rack structures, at least two ramp-level baggage makeup carousels with a corresponding circulation service road, and required building and code-compliant systems. The EBS facility is expected to be approximately between 90 to 100 feet tall and may require relocation of existing utilities. It is anticipated that the proposed EBS facility would be a multi-level structure constructed above the existing loading dock. Requirements Insurance Requirements Estimated Total Value Contract Term Print Page Bid Details Department: Aviation Commodity Code(s): 91815, 91819, 91897, 92549 Related Information Facebook X Back to top Accessibility Policy ADA Accommodations Sitemap Public Records Privacy & Legal Notices Contact Us Subscribe/Notify Me CharMeck Alerts CATS Riders Alerts Social Facebook LinkedIn Twitter Instagram © 2026 City of Charlotte | Powered by Granicus
Contact
Requirements
**Insurance Requirements** The City requires the awarded vendor(s) to obtain and maintain the following insurance coverage types: Automobile-For automobile operations liability Errors & Omissions / Professional Liability-For negligence or failure to perform in a professional capacity General Liability-For bodily injury or property damage, arising from products, premises, completed work, personal & advertising injury Workers Compensation-For lost wages and medical expenses of injured workers **Estimated Total Value** The total project value is anticipated to be: $5,000,000 - 9,999,999 **Contract Term** The term of the project is anticipated to be: Through Project Completion
Status
Upcoming
Reference
2026-Q2(Apr-Jun)-AVI-20780
Anticipated
Jul 27, 2026
Description
Charlotte Douglas International Airport (CLT) anticipates seeking statements of qualifications from professional architecture firms to provide design of an Early Baggage Storage (EBS) facility at Charlotte Douglas International Airport (CLT) to address operational constraints with the existing Baggage Handling System (BHS).
Detail Fetched
Yes

Source: City of Charlotte (opportunity CHARLOTTE_NC-Early-Bag-Storage-Design), retrieved via the City of Charlotte Contract Opportunities portal. View the official posting — always confirm requirements and deadlines with the issuing agency.