The Contractor will furnish all labor, materials, equipment, and parts for the inspection and maintenance on all roll-up and sliding doors in the Oroville Field Division. The Contractor will repair or replace roll-up and sliding doors to their full, proper, and safe operating condition. The Contractor must possess and display proof of a valid Contractors C61 or D28 license, during the duration of this agreement
Sell Event / RFx · Event version 1 · Department: Department of Water Resources · Event ID: 0000040957
UNSPSC categories:
The Contractor will repair or replace roll-up and sliding doors to their full, proper, and safe operating condition.
We post new interior installation opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Cal eProcure (event 0000040957), retrieved via California's Cal eProcure statewide procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.