In general, the California Health Care Facility (CHCF) Potable Water Treatment System (PWTS) project will construct a new chlorination boosting system to supplement the disinfection of potable water delivered by the City of Stockton. The project will construct a PWTS consisting of an above ground chemical storage tank, chemical injection system with required electrical, mechanical, metering and control equipment. An approximately 900 square foot pre-engineered metal building, with site work and utilities, will also be constructed to house the chemicals and associated equipment. Integration of the new Supervisory Control and Data Acquisition (SCADA) system with the existing SCADA system is also required. Upon completion, the project must ensure compliance with the Environmental Protection Agency (EPA) and State Water Resources Control Board (SWRCB) drinking water quality standards related to chlorine residual at CHCF.
Sell Event / RFx · Event version 1 · Department: Dept of Corrections & Rehab · Event ID: 0000040952
UNSPSC categories:
The project will construct a PWTS consisting of an above ground chemical storage tank, chemical injection system with required electrical, mechanical, metering and control equipment. An approximately 900 square foot pre-engineered metal building, with site work and utilities, will also be constructed to house the chemicals and associated equipment. Integration of the new Supervisory Control and Data Acquisition (SCADA) system with the existing SCADA system is also required. Upon completion, the project must ensure compliance with the Environmental Protection Agency (EPA) and State Water Resources Control Board (SWRCB) drinking water quality standards related to chlorine residual at CHCF.
We post new general contractors opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Cal eProcure (event 0000040952), retrieved via California's Cal eProcure statewide procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.