The solicitation is for electrical upgrades at a City Hall, including installation of a service entrance switchboard and replacement of two automatic transfer switches.
The place of performance is Utah (UT).
The due date for bids is 2026-11-17.
The post date is 2026-10-28.
The issuing agency is the State of Utah.
The scope includes coordination of electrical utility cutover.
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Bidding this one? Get the bid bond — free.The documents here don’t name one, so read them yourself — but public work almost always wants a bid bond with the bid.
Install and connect an electrical service entrance switchboard at an existing City Hall.
Replace two automatic transfer switches.
Coordinate the electrical utility cutover.
Posted Scope of Work
Installation and connection of electrical service entrance switchboard for an existing City Hall, replacement of two automatic transfer switches, and coordination of electrical utility cutover.
Scope, read from the documentsAI-generated
Installation and connection of electrical service entrance switchboard for an existing City Hall, replacement of two automatic transfer switches, and coordination of electrical utility cutover.
More electrical bids in Utah, weekly.
We post new electrical opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Questions & answers
AI-generated
What is the work location?
The place of performance is UT.
When is the bid due?
The due date is 2026-11-17.
What is the scope of work?
Installation and connection of electrical service entrance switchboard for an existing City Hall, replacement of two automatic transfer switches, and coordination of electrical utility cutover.
Full source recordEvery field State of Utah (BidNet Direct) published, untouched
Teaser
Ai Overview
Installation and connection of electrical service entrance switchboard for an existing City Hall, replacement of two automatic transfer switches, and coordination of electrical utility cutover.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? The bid bond is free.
Most Utah work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
You can have the bid bond before the deadline — one form, soft credit pull, A-rated surety. Prequalify instead and you skip the application on every bond after this one.Get the bid bond — free →Prequalify once instead (free) →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: State of Utah (BidNet Direct) (bid UT-444214129126), retrieved via the Utah BidNet Direct purchasing portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.