The Illinois Secretary of State is requesting bids for new-fluid applied roof system on the Index Building, located at 111 E. Monroe St Springfield, IL 62701. See attached IFB and drawings for details.
Pre-Bid Conference: MANDATORY PRE-BID MEETING Location: 501 S 2nd Street, Rm 037, Springfield, IL 62756, Date: November 5, 2026, Time: 9:00 AM
The contractor is responsible for all materials, equipment, supplies, labor, disposal services, incidentals, tools, and transportation to the Index Building. Work includes preparing the existing EPDM roofing system per manufacturer specifications (cleaning, patching, refurbishing areas with leaks and deterioration), installing new crickets where required to achieve positive drainage, installing a fluid-applied coating roof system, working around all existing roof-mounted accessories, providing and adhering a protective walk sheet/membrane, and providing all traffic signage and safety barricades. The contractor must also properly remove and dispose of all debris, implement safety measures, and perform work during normal business hours (7:00 AM to 5:00 PM, Monday through Friday). The project must be completed by June 30, 2027.
We post new roofing opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: BidBuy (Illinois) (bid 27-350SOS-PHYSE-B-54721), retrieved via the Illinois BidBuy open-bids board. View the official posting, and always confirm requirements and deadlines with the issuing agency.