Design and construction of projects including bicycle and pedestrian facilities, intersection improvements, raised center medians, upgraded traffic signals and bus stops.
Estimated Amount: $3,327,719.06
Special Notes: Compliance Plan Required.
The work includes the design and construction of Portland cement concrete sidewalks, sidewalk ramps with detectable warnings, streetscape appurtenances (benches, bicycle racks, trash receptacles, street lights, tree wells, and planters), pedestrian railings, and shared-use paths. It also involves adjusting structures such as water meters, valve boxes, survey monument boxes, and pull boxes; constructing concrete encasement and encasement pipe; and providing excavation safety systems for trenches. The project includes pipe installation for mains, sewers, laterals, culverts, and service connections, with specific material requirements for ductile iron, concrete, PVC, HDPE, and steel pipe, including joint materials, bedding, backfill, and tracer tape.
We post new asphalt opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Required by the city at the permit stage, not with your bid. Inferred from where the work happens — confirm forms and amounts with the permit office before you start.
Source: City of Austin (solicitation 137794), retrieved via Austin Finance Online (AFO). View the official posting, and always confirm requirements and deadlines with the issuing agency.