Hwy. 49 Mississippi River Bridge Rehab. (S) — Phillips County | 49 | AM.
Route(s): 49.
Letting November 4, 2026 (bids due 10:00 AM).
ARKANSAS DEPARTMENT OF TRANSPORTATION
110812
HWY. 49 MISSISSIPPI RIVER BRIDGE REHAB. (S)
FEDERAL AID PROJECT NHPP-PRTT-HIPBIP-0054(31)
THE PURPOSE OF THIS PROJECT IS TO REHABILITATE THE MISSISSIPPI RIVER BRIDGE INCLUDING DECK REPLACEMENT
AND POLYMER OVERLAY ON HIGHWAY 49 IN PHILLIPS COUNTY. THIS PROJECT CONSISTS OF REMOVAL AND DISPOSAL
ITEMS, STONE BACKFILL, TRENCHING AND SHOULDER PREPARATION, AGGREGATE BASE COURSE, PORTLAND CEMENT
CONCRETE BASE, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING
ROADWAY, APPROACH SLABS AND GUTTERS, PORTLAND CEMENT CONCRETE PAVEMENT PATCHING, MAINTENANCE OF
TRAFFIC, GUARDRAIL, GEOTEXTILE FABRIC, TRAFFIC SIGNAL ITEMS, MODIFICATION OF EXISTING BRIDGE STRUCTURE,
STEEL REPAIR, LIGHTWEIGHT CONCRETE, BRIDGE JACKING, AND MISC. ITEMS.
ROUTES: 49
SECTIONS: 11
COUNTY: PHILLIPS
LENGTH: 1.163 miles in length.
THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
202042 R&D OF CONCRETE PAVEMENT 32.00 SQYD
202053 R&D OF APPR.SLAB & GUTTERS 2.00 EACH
202132 R&D OF GUARDRAIL 1,604.00 LF
202794 REMOVAL & DISPOSAL OF CONDUIT & CABLE 1.00 L.S.
202795 REMOVAL & DISPOSAL OF ITS EQUIPMENT 1.00 L.S.
202796 REMOVAL & DISPOSAL NAVIGATION LIGHTING 1.00 L.S.
202797 REMOVAL AND DISP OF OBSTRUCTION LIGHTING 1.00 L.S.
207011 STONE BACKFILL 50.00 TON
215011 TRENCH.AND SHOULDER PREP. 5.00 STA
303117 AGGR.BASE COURSE(CLASS 7) 83.00 TON
309510 P.C.CONCRETE BASE-10" 117.00 SQYD
401011 TACK COAT 513.00 GAL
407162 MA IN ACHM SURFACE(1/2") 538.00 TON
407452 AB(PG76-22)ACHM SURF(1/2") 34.00 TON
412002 COLD MILLING ASPHALT PVMT. 4,930.00 SQYD
414011 ASPH.CONC.PATCH-MAINT. 5.00 TON
415011 ACHM PATCH.EXIST.RDWY. 25.00 TON
504031 APPROACH SLABS 94.80 CUYD
504264 APPROACH GUTTERS 18.84 CUYD
507229 P.C.C.P.
The project consists of removal and disposal items, stone backfill, trenching and shoulder preparation, aggregate base course, Portland cement concrete base, ACHM surface course, cold milling asphalt pavement, ACHM patching of existing roadway, approach slabs and gutters, Portland cement concrete pavement patching, maintenance of traffic, guardrail, geotextile fabric, traffic signal items, modification of existing bridge structure, steel repair, lightweight concrete, bridge jacking, and miscellaneous items. The project is 1.163 miles in length.
We post new asphalt opportunities in Arkansas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Arkansas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arkansas Department of Transportation (solicitation 110812), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.