For constructing the Left and Right Turn Lane Installation (Grading, Drainage, Pavement, and Traffic Stripe) on SR-106 at a point 0.250 mile east of the I-65 Interchange in Georgiana. Length 0.352 mi.
County: Butler County, Alabama
Contract Time: 45 Working Days
Bracket Estimate: $918,151 to $1,122,185
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
The project constructs left and right turn lanes on SR-106 at a point 0.250 mile east of the I-65 Interchange in Georgiana, Alabama, covering a length of 0.352 miles. Work includes grading, drainage, pavement construction, and traffic striping, to be completed within 45 working days.
We post new asphalt opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261204-CALL058), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.