For constructing the Intersection Improvements on SR-67 at Upper River Road in Decatur. Length 0.205 mi.
County: Morgan County, Alabama
Contract Time: 90 Working Days
Bracket Estimate: $1,169,634 to $1,429,553
Bids are received by the Alabama Department of Transportation, Office Engineer Bureau, Plans and Proposals Section. State law requires bidders to be pre-qualified with ALDOT.
For constructing the intersection improvements on SR-67 at Upper River Road in Decatur including clearing and grubbing, removing concrete and pipe and guardrail, excavation and borrow, geosynthetic reinforcement, aggregate base and bituminous base and superpave paving with milling, storm sewer pipe, junction boxes and inlets, concrete gutter and curb and gutter, guardrail, topsoil and seeding and sodding, erosion control, striping and markers and signs, traffic signal poles and heads and controller and detection with power service and lighting, and maintenance of traffic with signs, drums, cones, barricades and message signs.
We post new asphalt opportunities in Alabama as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alabama work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alabama Department of Transportation (solicitation 20261106-CALL026), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.