This federally funded contract includes all work required for the construction of facility repairs caused by the 2018 earthquake at Ted Stevens Anchorage International Airport (ANC). The work is separated into three distinct packages, one each for the South Terminal, North Terminal, and Field Maintenance Building. The contract includes two (2) additive alternates for removal and replacement of flooring in a portion of the Field Maintenance Building.
Contract #: CDRER00775
IRIS Program #: CDRER00775, CDRER00848, CDRER00849
On the Job Trainees/Apprentices (item 645): None
Engineer's Estimate Range: Between $1,000,000 and $2,500,000
Bid Opening: 11/4/2026 (before 2:00 PM local time)
Advertise Date: 10/13/2026
Region: Central Region
Community: Anchorage
The contract includes all work required for the construction of facility repairs caused by the 2018 earthquake at Ted Stevens Anchorage International Airport (ANC). The work is separated into three distinct packages, one each for the South Terminal, North Terminal, and Field Maintenance Building. The contract includes two (2) additive alternates for removal and replacement of flooring in a portion of the Field Maintenance Building.
We post new architecture and design opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Alaska work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Alaska Department of Transportation & Public Facilities (solicitation CDRER00775), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.