The proposed project is located on SR 95 between MP 158.8 and 161.5 south of Parker in La Paz County. The work consists of constructing rockfall mitigation measures in four locations. The work includes excavation, rock netting, scaling, concrete barrier, concrete spillways, erosion control, and other related work.
District: NorthWest District
Item # 103844
Route/County/MP: 095 LA 158
TRACS: F070601C
Project: 095-C-(229)T
Type of work: System Enhancement (Safety Improvements)
Pre-qualification: YES
Plans status: Available
Addenda: 1
Plan holders (4 pamphlet, 6 non-bid-set): SHOW LOW CONSTRUCTION, INC.; FANN CONTRACTING, INC; TECHNOLOGY CONSTRUCTION, INC.; GRANITE CONSTRUCTION COMPANY; Law Enforcement Specialists, Inc.; CANYON STATE BARRICADE SERVICES, LLC; Global Rock Works, LLC (GRW); Adams Contracting & Excavating, Inc.; APEX ROCKFALL MITIGATION; Sprocket Transport, Inc.
The work consists of constructing rockfall mitigation measures in four locations along SR 95 between MP 158.8 and 161.5. The work includes excavation, rock netting, scaling, concrete barrier, concrete spillways, erosion control, and other related work. Specific elements include installing rockfall drape, roadside drainage improvements, constructing a flat bottom deepened rockfall ditch with concrete half barrier, and installing draped mesh rock slope protection systems with anchors, wire rope, and various mesh types.
We post new wall-making opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Arizona Department of Transportation (solicitation 2024089-F070601C), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.