The U.S. Army Corps of Engineers, Philadelphia District, intends to award a Firm-Fixed Price, Indefinite Delivery Indefinite Quantity (IDIQ) Single Award Task Order Contract (SATOC) for Preventative Maintenance and Repair of Heavy Equipment for the Fort Mifflin Project Office within the USACE Philadelphia (NAP) District area of responsibility in accordance with the attached Performance Work Statement (PWS).
The Contractor is responsible for scheduling work in accordance with the requirements of task order issued and during regular business hours when scheduling on site work. The site conducts regular business from 7:00am to 3:00pm, Monday through Friday, except for federal holidays. All work is to be performed during these regular business hours. Any hours to be worked outside of the regular business hours shall be coordinated with the COR.
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform preventative maintenance and repair of heavy equipment for the Fort Mifflin Project Office as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
The Fort Mifflin Project Office is responsible for the construction of the district’s disposal areas located along the Delaware River. Our mission supports the deepening and the maintenance dredging of the Delaware River and Wilmington Harbor. Heavy Equipment is utilized to construct dikes, ditching for drying and other dirt work. Our equipment is currently composed of D6 Dozers, Excavators (tracks and pontoons), dump trucks (articulated). Without equipment to provide the necessary dirt work in these disposals’ areas, dredging assignments in the Delaware Harbor could not be accomplished. It is important that dredging and proper disposal activities of dredge materials is accomplished because it directly effects commerce and the safety of vessels transporting commodities and other resources to the ports.
See attachment labeled "W912BU26QA024_FMPO Combined Solicitation Synopsis.pdf" with the requirements of this RFQ and other attachments required for informational and submission purposes.
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform preventative maintenance and repair of heavy equipment for the Fort Mifflin Project Office. Preventative maintenance includes PM1, PM2, PM3, and PM4 categories performed every 250 hours per manufacturer manuals. Emergency repairs require response within 48 hours and diagnosis within 24 hours. Non-emergency repairs require a proposal within 24 hours. Work is performed at Fort Mifflin, Pedricktown, Fort Mott/Killcohook, Wilmington South, Artificial Island, Penns Neck, Chesapeake City, Cape May, and Oldmans, or at the contractor's facility. The contractor must also submit fluid samples, maintain a quality control program, and provide a work plan.
We post new equipment maintenance & rental opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"19107-3390""PHILADELPHIA""PA""USA""1650 ARCH STREET""USACE WANNAMAKER BLDG 7TH FLOOR""Preventative Maintenance and Repair of Heavy Equipment for the Fort Mifflin Project Office PWS.pdf"259642"file"".pdf""1""2026-09-30T20:41:22.353+00:00""64fe0ca9b69f48c5b8f6dbcc3d78b1c6""public""0""public""a1e476a51b4d464493196fdb7d05a3da""0"8"0""W912BU26QA024_FMPO Combined Solicitation Synopsis.pdf"277392"file"".pdf""1""2026-09-30T14:22:23.357+00:00""b22f273d02db4a2da891898d64344dad""public""0""public""a6ef1a579df3476aa003709803bdaafc""0"7"0""Service Contract Act WD 2015-4233.pdf"46754"file"".pdf""1""2026-09-30T14:22:23.357+00:00""b29f3a40e5404cc9b8158558333e1bc1""public""0""public""5a290bb0cfec4da28433ad92863b057e""0"6"0""NAVFACUSACE Past Performance Questionnaire (PPQ).docx"59666"file"".docx""1""2026-09-30T14:22:23.357+00:00""c6ec410dab864d818d0e5310e581a830""public""0""public""c8bbd7692083497aaba100ed4d757091""0"3"0""Section B_FMPO Bid Schedule_W912BU26QA024.xlsx"53751"file"".xlsx""1""2026-09-30T14:22:23.357+00:00""f9f311778550489a967c0f85613ef67a""public""0""public""d5ae6adc160d44828c39c3862b7b3b5f""0"2"0"Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9d87a08453784db3aa5ee735d8453dc5), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.