Amendment 0007 extends proposal due date and time, provides RFI Log No. 2 VA responses, incorporate technical documents revisions and other official information.
Expand Emergency Room at Boise VAMC including architectural, electrical, low-voltage, door hardware, glazing, headwalls, patient lifts, lighting controls with central panel CP-LTG networked system, power distribution including ATS and transformers, pneumatic tube station and carriers, and related interior work. Amendment 0007 incorporates revised Drawing E501 and Specification Section 080671 for door hardware, and provides RFI Log No. 2 clarifications governing headwall locations, lift locations, transformer T3 remaining, equipment sizing and placement, phasing, and finish details.
We post new general contractors opportunities in Idaho as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""98662""VANCOUVER""WA""USA""5115NE 82ND AVE""SUITE 102""36C26027R0002 0007.pdf"168969"file"".pdf""1""2026-11-19T23:08:08.007+00:00""dbceb4c01e8944dcb64765943aaa8edb""public""0""public""9b51bc7dd0d7415e8b0bfee64abd1687""0"8"0""Atch. 1_36C26027R0002 0007_RFI Log No. 2_531-25-102 Expand ER.xlsx"20263"file"".xlsx""1""2026-11-19T23:08:08.007+00:00""004283a13bcc40e8ac5db651c6f0b691""public""0""public""48ed273280974bcdb99464ceb324506e""0"7"0""Atch. 2_36C26027R0002 0007_Drawing E501-rv_531-25-102 Expand ED.pdf"1141977"file"".pdf""1""2026-11-19T23:08:08.007+00:00""37df1a9a5ce94fd4859bb6817270845b""public""0""public""b648febc7dcd423bb1ff3b78ca1608c3""0"6"0""Atch. 3_36C26027R0002 0007_Specs. Sec. 080671-rv_531-25-102 Expand ED.pdf"4231211"file"".pdf""1""2026-11-19T23:08:08.007+00:00""dc50c65eeb78404d82b65d7bcabf5d63""public""0""public""3152561e11ce471f99f84b42db9c554d""0"5"0"Most Idaho work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9c90cd15f29d407c9ea106c281373e63), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.