We'll email you new asphalt opportunities in Missouri as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The purpose of this amendment is to amend the Specifications SECTION 33 40 00 Paragraph 1.2 and Paragraph 3.1, and Section 03 42 13.00 10 Paragraph 3.3.3 (attached).The U.S. Army Corps of Engineers, Kansas City District, Intends to issue an invitation for bid (IFB) solicitation for construction activities for storm sewer separation and improvements. The work covered by this contract consists of furnishing all equipment, labor, operators, supervision/ site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform related work, including pavement, sidewalk, driveway, and parkway restoration. RTA Plans and Specs have been included as separate attachments. * The Supplemental Bid Schedule Attachment has been added.
The work consists of furnishing all equipment, labor, operators, supervision, quality control, supplies, materials and incidentals for storm sewer separation, including new sewer pipe installation, drainage structure and junction box installation, outfall structure to White Clay Creek, removal of existing structures, erosion control, traffic control for the option, and pavement, sidewalk, driveway, curb and gutter, and parkway restoration with seed and sod across the 16th Street base alignment and 15th Street option alignment.
"64106-2896""KANSAS CITY""MO""USA""CONTRACTING DIV CORPS OF ENGINEERS""601 E 12TH ST""503708_ATCH_CSO_RTA_SPECS.pdf"25568695"file"".pdf""1""2026-10-19T13:57:57.089+00:00""9f9c34f491344fab98cf6d03e52614ee""public""0""public""abf7f475729a4cfe879f049d2bc0587a""0"37"0""Solicitation Amendment W912DQ27BA0020002 SF 30.pdf"183545"file"".pdf""1""2026-11-13T21:04:35.401+00:00""ec1fa5c513f345bcb602cc59f2509aeb""public""0""public""89ef7b93d5944555bfb194d7746266b0""0"36"0""W912DQ27BA002 Amendment 0002 - SECTION 33 40 00 -33 42 13.docx"25259"file"".docx""1""2026-11-13T21:04:35.401+00:00""fb818494f8b84bb88b004edcd6796af6""public""0""public""af73380f71574a42b6d9288c52efb25b""0"34"0""Solicitation Amendment W912DQ27BA0020001 SF 30.pdf"4001901"file"".pdf""1""2026-11-10T16:41:40.214+00:00""14020de1f9e44b8490bbfd389659ac30""public""0""public""b7a088f1459940aeb66ebc62b75b44bc""0"32"0""Update 9001 Atchison CSO Supplemental CLIN Schedule V2.xlsx"12936"file"".xlsx""1""2026-10-19T20:46:48.128+00:00""18f45ee744924710a8ad673d5de28961""public""0""public""5aa7591a0d9a4a34a834a7ea65e5d499""0"24"0""2026_09_21_503708_ATCH_CSO_RTA_PLANS.pdf"83368653"file"".pdf""1""2026-10-19T13:57:57.089+00:00""79a089d46a3548c2b40067104ee47621""public""0""public""6620bd79d9524c04bac42c11085d69fe""0"17"0""Bidder Inquire Atchison CSO Construction.pdf"262950"file"".pdf""1""2026-11-05T17:39:12.478+00:00""dcb3530cee584b2f8281089f3f42de33""public""0""public""229868a9576c4706845199acb09e74bb""0"11"0""Addendum to Bidder Inquire Atchison CSO Construction.pdf"93425"file"".pdf""1""2026-11-09T17:10:50.427+00:00""9a46e0650f894d44802c9c1f75eabe1b""public""0""public""bf1e2db54d4a457c96449f64cf04d738""0"10"0""B.07.01 Site Visit Attendance.pdf"72980"file"".pdf""1""2026-10-20T18:51:57.439+00:00""3abf2210c8354893a9be1afc811a3a78""public""0""public""aabe620f3258468188f38718668410f1""0"9"0""KDOT 16th Street Permit.pdf"215718"file"".pdf""1""2026-11-05T17:39:12.478+00:00""128b4faea56d442dafb406b15b931502""public""0""public""64ef463d071b45b3a80246518b3d9d98""0"5"0""Geotechnical_Report_ATCH_CSO.pdf"5133126"file"".pdf""1""2026-11-05T17:39:12.478+00:00""689d83f8ac054f4db36a2416e539b3f0""public""0""public""fbd3c1f5843f4d4a9f71401db550e279""0"4"0""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DQ27BA002¬iceType=SolicitationNotice"0"link""1""2026-10-13T18:41:06.906+00:00""8f18c6533346479db2f9d62758b41926""public""0""PIEE Solicitation Module Link for W912DQ27BA002""public""da18d486b43041a199bc7486045668ff""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-13T18:41:06.906+00:00""07ed9869210e42c59fabece7afd39938""public""0""Web Based Training for the PIEE Solicitation Module""public""a6784465ab904a9ab55846bab5a5212e""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-13T18:41:06.906+00:00""a37f92f33f9a401eb02e80828df2e4bd""public""0""Registration Instructions for the PIEE Solicitation Module""public""9e900b483c9549b183c38372e2030c7d""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-13T18:41:06.906+00:00""958de26e812e4e508e7108b03e54063e""public""0""Department of Defense Procurement Toolbox""public""18342cb51ab44942a6c5913f6d602f86""0"1"0"Most Missouri work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9b59625157a24de68bfea48d41dfe72c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.